01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

• The incidence of flooding should decrease generally. See assessment of effects section in<br />

application <strong>for</strong> details.<br />

11 Please attach your calculations which show that the diversion design is adequate, including<br />

design flood flows, return periods, etc.<br />

• See <strong>Mangatawa</strong> drain options report in application appendices<br />

12 Have you discussed your diversion with any potentially affected parties?<br />

(e.g. neighbours, <strong>water</strong> users, the Fish and Game Council, Department of Conservation, etc.)<br />

Yes<br />

No<br />

13 Persons likely to be directly affected:<br />

For your application to be considered <strong>for</strong> non-notification, you must gain the written approval of all<br />

persons who may be affected by the proposal. Please specify below those parties who may be<br />

affected (or interested by your proposal).<br />

• See consultation section in application<br />

Persons who may be interested or affected and consultation undertaken<br />

• See consultation section in application<br />

Status: Final Page 24 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!