- Page 1: Mangatawa Drain Flood Bypass and TE
- Page 5 and 6: NZ Transport Agency and Tauranga Ci
- Page 7 and 8: NZ Transport Agency and Tauranga Ci
- Page 9 and 10: NZ Transport Agency and Tauranga Ci
- Page 11 and 12: NZ Transport Agency and Tauranga Ci
- Page 13 and 14: NZ Transport Agency and Tauranga Ci
- Page 16 and 17: NZ Transport Agency and Tauranga Ci
- Page 18 and 19: NZ Transport Agency and Tauranga Ci
- Page 20 and 21: NZ Transport Agency and Tauranga Ci
- Page 22 and 23: NZ Transport Agency and Tauranga Ci
- Page 24 and 25: NZ Transport Agency and Tauranga Ci
- Page 26 and 27: NZ Transport Agency and Tauranga Ci
- Page 28 and 29: NZ Transport Agency and Tauranga Ci
- Page 30 and 31: NZ Transport Agency and Tauranga Ci
- Page 32 and 33: NZ Transport Agency and Tauranga Ci
- Page 34 and 35: NZ Transport Agency and Tauranga Ci
- Page 36 and 37: NZ Transport Agency and Tauranga Ci
- Page 38 and 39: NZ Transport Agency and Tauranga Ci
- Page 40 and 41: NZ Transport Agency and Tauranga Ci
- Page 43: NZ Transport Agency and Tauranga Ci
- Page 46 and 47: NZ Transport Agency and Tauranga Ci
- Page 48 and 49: NZ Transport Agency and Tauranga Ci
- Page 50 and 51: NZ Transport Agency and Tauranga Ci
- Page 52 and 53:
NZ Transport Agency and Tauranga Ci
- Page 54 and 55:
NZ Transport Agency and Tauranga Ci
- Page 56 and 57:
NZ Transport Agency and Tauranga Ci
- Page 58 and 59:
NZ Transport Agency and Tauranga Ci
- Page 60 and 61:
NZ Transport Agency and Tauranga Ci
- Page 62 and 63:
NZ Transport Agency and Tauranga Ci
- Page 64 and 65:
NZ Transport Agency and Tauranga Ci
- Page 66 and 67:
NZ Transport Agency and Tauranga Ci
- Page 68 and 69:
NZ Transport Agency and Tauranga Ci
- Page 70 and 71:
NZ Transport Agency and Tauranga Ci
- Page 72 and 73:
NZ Transport Agency and Tauranga Ci
- Page 74 and 75:
NZ Transport Agency and Tauranga Ci
- Page 76 and 77:
NZ Transport Agency and Tauranga Ci
- Page 78 and 79:
NZ Transport Agency and Tauranga Ci
- Page 80 and 81:
NZ Transport Agency and Tauranga Ci
- Page 82 and 83:
NZ Transport Agency and Tauranga Ci
- Page 84 and 85:
NZ Transport Agency and Tauranga Ci
- Page 86 and 87:
NZ Transport Agency and Tauranga Ci
- Page 88 and 89:
NZ Transport Agency and Tauranga Ci
- Page 90 and 91:
NZ Transport Agency and Tauranga Ci
- Page 92 and 93:
NZ Transport Agency and Tauranga Ci
- Page 94 and 95:
NZ Transport Agency and Tauranga Ci
- Page 96 and 97:
NZ Transport Agency and Tauranga Ci
- Page 98 and 99:
NZ Transport Agency and Tauranga Ci
- Page 100 and 101:
NZ Transport Agency and Tauranga Ci
- Page 102 and 103:
NZ Transport Agency and Tauranga Ci
- Page 104 and 105:
NZ Transport Agency and Tauranga Ci
- Page 106 and 107:
NZ Transport Agency and Tauranga Ci
- Page 108 and 109:
NZ Transport Agency and Tauranga Ci
- Page 110 and 111:
NZ Transport Agency and Tauranga Ci
- Page 112 and 113:
NZ Transport Agency and Tauranga Ci
- Page 114 and 115:
NZ Transport Agency and Tauranga Ci
- Page 116:
APPENDIX 1 - Drawing 3932036 ck301R
- Page 120:
APPENDIX 3 - Drawing 3932036 ck119
- Page 126:
APPENDIX 5 - Bioresearches Report:
- Page 205 and 206:
APPENDIX 7 - Archaeological Assessm
- Page 207 and 208:
ARCHAEOLOGY B.O.P. HERITAGE CONSULT
- Page 209 and 210:
2 INTRODUCTION Project Background T
- Page 211 and 212:
4 ARCHAEOLOGICAL LANDSCAPE Previous
- Page 213 and 214:
6 U14/1708 & 1709 Figure 3. Cadastr
- Page 215 and 216:
8 Figure 6. Part ML 8133 showing Pt
- Page 217 and 218:
10 Hungahunga & Toroa A further ton
- Page 219 and 220:
12 APRIL 2008 ARCHAEOLOGICAL SURVEY
- Page 221 and 222:
14 Historic Places Act In addition
- Page 223 and 224:
APPENDIX 8 - Hydraulic Modelling: M
- Page 225 and 226:
Hydraulic Modelling: Mangatawa Drai
- Page 227 and 228:
undertake investigations into the d
- Page 229 and 230:
Discharge to Papamoa Beach To disch
- Page 231 and 232:
• Riparian planting adjacent to t
- Page 233 and 234:
2.2 Hydrological Assessment 2.2.1 C
- Page 235 and 236:
The Maranui catchment area in the m
- Page 237 and 238:
Table 7 - 2% AEP Storm Event Top Sp
- Page 239 and 240:
These results include climate chang
- Page 241 and 242:
3.3 Maintenance Work in Mangatawa D
- Page 243 and 244:
stormwater from the Maranui catchme
- Page 245:
Appendix A Mangatawa Drain Layout P
- Page 249:
Appendix C Runoff Hydrographs
- Page 255:
Appendix E Proposed Lower Mangatawa
- Page 263:
APPENDIX 10 - Drawings 3932036 ck46
- Page 272:
APPENDIX 12 - Drawing 3932036 ck227
- Page 275 and 276:
Report Tauranga Eastern Motorway -
- Page 277 and 278:
1 Introduction This report describe
- Page 279 and 280:
embankment settlement rates, and th
- Page 281 and 282:
3.2 Construction Sequence The typic
- Page 283 and 284:
concrete contamination as well as s
- Page 285 and 286:
Pahse 1 consists of the western sec
- Page 287 and 288:
• Installation of Stage 2 decanti
- Page 289:
Appendix A Erosion and Sediment Con
- Page 295 and 296:
Activity Status Mangatawa Drain 1.1
- Page 297 and 298:
(b) Natural State (River) Water Qua
- Page 299 and 300:
6. Reclamation or drainage of the b
- Page 301 and 302:
APPENDIX 15 - Legal Descriptions of
- Page 303 and 304:
Path: P:\393\3932036\TGI\55_Project
- Page 311 and 312:
32 Harington Street PO Box 903, Tau
- Page 313:
32 Harington Street PO Box 903, Tau