NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

7. Description of the Proposal<br />

The elements of the proposal that are the subject of this application are the works related to the construction<br />

and operation of the <strong>storm</strong><strong>water</strong> management system of the TEM and the works related to the construction<br />

and operation of the <strong>Mangatawa</strong> Flood Bypass. These <strong>storm</strong><strong>water</strong> control devices are linked by the way they<br />

operate together to manage <strong>storm</strong><strong>water</strong> in day to day and flood events, but are separate in the issues they<br />

designed to address.<br />

The description below addresses each package of activities separately.<br />

7.1 <strong>Mangatawa</strong> Flood Bypass Activities<br />

The following is a summary of the key features of the flood bypass proposal and is further detailed in the<br />

technical report attached as Appendix 8.<br />

7.1.1 Increased Drain Storage<br />

On the eastern side of Kairua Road, enclosed between the rail track and the motorway, a storage area will be<br />

created by excavating approximately 21,000m 3 - 28,000m³ over an area of 1.2 ha (this will involve excavating<br />

a set distance from the current railway track allowing <strong>for</strong> possible track duplication, at a 1V in 5H batter to a<br />

level set above the current drain). The current drain will serve as the main channel with the new storage area<br />

set above normal (dry weather flow) <strong>water</strong> level. The creation of this additional storage will require excavation<br />

in the drain, conveying of the excavated material and the regrassing of the newly shaped drain and flood plain.<br />

7.1.2 Top Spill Bund<br />

Currently there is an earth bund that starts from the rail track where the <strong>catchment</strong>s of the Papamoa hills drain<br />

under the rail track. This bund will be strengthened and extended and will follow the drain alignment on the<br />

northern side.<br />

The bund will be 3 metres wide at the top with a 1 in 3 slope with a total estimated fill volume of 3,000 m 3 –<br />

4,000m 3 . The bund will follow the rail track alongside the State Highway from chainage 9500 to a highpoint at<br />

chainage 8950. The bund is designed to be overtopped periodically and there<strong>for</strong>e will require rein<strong>for</strong>cement<br />

and regular maintenance. An earth bund was chosen as it will be easier to maintain with a 3 metre wide top<br />

and appropriately vegetated batters. The creation of the earth bund will require importing material and<br />

working alongside the current drain.<br />

7.1.3 Bruce Spill Stop Bank<br />

For the Bruce Spill Stop Bank a stop bank will be constructed between the highway and drain from CH7300 to<br />

CH8700. This may take the <strong>for</strong>m of a concrete crash barrier. The barrier will be designed to operate to allow<br />

<strong>for</strong> over topping.<br />

Status: Final Page 67 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE