01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

Suspended Solids:<br />

See project description in application<br />

BOD5:<br />

See project description in application<br />

Faecal Coli<strong>for</strong>ms:<br />

See project description in application<br />

Enterococci:<br />

See project description in application<br />

The chemical content, including heavy metals or toxic substances, nitrates, ammonia and<br />

dissolved reactive phosphorus:<br />

• See project description in application<br />

b) Is the contaminant treated in any way be<strong>for</strong>e discharge?<br />

Yes<br />

No<br />

If Yes, describe treatment<br />

• See project description in application<br />

c) What is the name of the <strong>water</strong> body into which the discharge is made (e.g. at the discharge site<br />

name of stream, river, lake, bay, harbour)?<br />

• Rangataua Bay, Tauranga Harbour<br />

Is this in the coastal marine area? Yes No<br />

What is the <strong>water</strong> quality in the <strong>water</strong> body?<br />

• See project details in application <strong>for</strong> details<br />

d) Discharge rate in<strong>for</strong>mation:<br />

• For the details regarding Maximum flow rate, Maximum daily flow, Average dry weather flow<br />

and Average wet weather flow, please see the project description in the application.<br />

For non <strong>storm</strong><strong>water</strong> discharges, is the discharge: N/A<br />

What will be the maximum discharging period?<br />

• See project description in application <strong>for</strong> details.<br />

e) Does the discharge also involve: diversion of natural <strong>water</strong> Yes No<br />

discharge to air Yes No<br />

piping across a <strong>water</strong>way or <strong>water</strong> body Yes No<br />

any structure in <strong>water</strong>way or <strong>water</strong> body Yes No<br />

Status: Final Page 26 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!