2. Mangatawa catchment consents for earthworks, storm water ...
2. Mangatawa catchment consents for earthworks, storm water ...
2. Mangatawa catchment consents for earthworks, storm water ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NZ Transport Agency and Tauranga City Council<br />
<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />
• See assessment of effects in application<br />
4 Methods used to avoid/remedy or mitigate these environmental effects<br />
For each of the effects identified above, describe the measures you will take to avoid / reduce /<br />
remedy them:<br />
• See assessment of effects in application<br />
4.1 Erosion and sediment control plans<br />
Erosion and sediment control plans must establish clearly which control measures are intended to<br />
prevent erosion and off site sedimentation and how they relate to the proposal. Making the ef<strong>for</strong>t<br />
to produce comprehensive plans which are easy to follow (e.g. use colour <strong>for</strong> cut/fill areas, extent<br />
of <strong>earthworks</strong> etc) will save time and money in processing the application.<br />
The in<strong>for</strong>mation included in erosion and sediment control plans should correspond to the scale and<br />
significance of the proposal. Small–scale proposals having minor effects may supply sufficient<br />
in<strong>for</strong>mation by drawing a sketch plan in the space provided. For more significant proposals,<br />
detailed plans should be drawn to show the erosion and sediment control measures intended <strong>for</strong><br />
each stage of the proposal.<br />
Refer to Environment Bay of Plenty erosion and sediment control guidelines <strong>for</strong> <strong>earthworks</strong>.<br />
• See description of the proposal and appendices application<br />
a) Schedule of Works<br />
Describe the estimated timing of each stage of the <strong>earthworks</strong> including the installation/removal of<br />
erosion and sediment controls, and any other relevant works.<br />
Stage<br />
Description<br />
Expected Start<br />
Date<br />
Expected<br />
Completion<br />
Date<br />
1 See description of the proposal in application 2010 2015<br />
b) What erosion control measures are proposed and what are the expected efficiencies of these<br />
measures?<br />
• See description of the proposal and appendices application<br />
c) What sediment control measures are proposed and what are the expected efficiencies of these<br />
measures?<br />
• See description of the proposal and appendices application<br />
4.2 Dust control plan<br />
Status: Final Page 19 April 2009<br />
Project Number: 3932036<br />
NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE