(f) The resource consent applicant shall supply:<br />

(i) A report confirming that the culvert embankment shall be comprised of suitable soils free of<br />

wood, humus and other organic matter; and that the embankment shall be well compacted in<br />

uni<strong>for</strong>m layers not exceeding 300 mm loose depth to achieve a compaction of at least 95 percent<br />

of maximum dry density.<br />

(ii) A geotechnical report affirming that the culvert embankment will be of safe batter slope, and<br />

constructed to avoid failure.<br />

Environment Bay of Plenty restricts its discretion to the following matters:<br />

(a) Measures to avoid, remedy or mitigate the adverse effects of the structure on:<br />

(i) Erosion or land instability, including erosion protection works.<br />

(ii) The passage of fish.<br />

(iii) Aquatic ecosystems, including indigenous biodiversity.<br />

(iv) Property owned or occupied by another person, including flooding or ponding.<br />

(v) Natural <strong>water</strong> flow and flood flows.<br />

(vi) Other structures.<br />

(vii) Navigation in navigable rivers and lakes.<br />

(viii) Houses, assets and other activities downstream of the culvert, which are at risk of the culvert<br />

failure.<br />

(b) Measures to minimise the duration and extent of bed disturbance.<br />

(c) Measures to avoid or mitigate vegetation, soil, slash construction material or other debris being<br />

deposited in the surface <strong>water</strong> body, or placed in a position where it could readily enter or be<br />

carried into a <strong>water</strong> body.<br />

(d) Maintenance of the culvert.<br />

(e) Construction standards, including ensuring the structure can not break free and cause a<br />

blockage or erosion.<br />

(f) Number of culverts in the cross-sectional area of the stream.<br />

(g) Monitoring requirements.<br />

Explanation/Intent of Rule<br />

To provide <strong>for</strong> culverts where the fill height in the crossing structure needs to be assessed fully by<br />

Environment Bay of Plenty.<br />

Beca // 22 December 2008 // Page 6<br />

// NZ1-1349440-2 0.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!