NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

<strong>Mangatawa</strong> Flood Bypass and TEM Storm<strong>water</strong><br />

Consent Required Status Activity Plan<br />

Ref<br />

Proposed<br />

Consent Holder<br />

10yrs<br />

35yrs<br />

Construction of bund and flood<br />

storage area (Flood Bypass) on<br />

lower <strong>Mangatawa</strong> Drain<br />

Earthworks Discretionary NZTA component of TCC<br />

Treatment Pond Enlargement<br />

Discharges to Water and Land – Rule 48, Form 8, Form 9, Variation<br />

17A<br />

NZTA<br />

Discharges to Water or<br />

Land<br />

Discretionary<br />

Discharge (spill) from <strong>Mangatawa</strong><br />

Drain across SH 2 to Land (in flood<br />

event)<br />

TCC<br />

Discharges to Water or<br />

Land<br />

Discretionary<br />

Discharge from Maranui Swale to<br />

harbour via culverts at Ch 6850<br />

into <strong>Mangatawa</strong> Drain (in flood<br />

event)<br />

9 TCC<br />

Discharge of Storm<strong>water</strong><br />

to Water or Land<br />

Restricted<br />

Discretionary<br />

Discharge from TCC Treatment<br />

Pond to harbour<br />

14 TCC<br />

Damming and Diversion of Water – Rule 48<br />

Diversion of <strong>water</strong><br />

(Surface Runoff)<br />

Discretionary Operation of a Bund & Barrier in 2<br />

locations<br />

2,4 TCC<br />

Diversion of <strong>water</strong><br />

(Surface Runoff)<br />

Discretionary<br />

Through 2 culverts at <strong>Mangatawa</strong><br />

Lane (Ch 6850)<br />

9 TCC<br />

(in flood event)<br />

Activities in the beds of rivers streams and lakes – Rule 68, 71, Form 1<br />

Activity in the Bed Discretionary <strong>Mangatawa</strong> drain works (potential<br />

<strong>for</strong> temporary bed disturbance)<br />

Activity in the Bed Discretionary <strong>Mangatawa</strong> Drain widening to<br />

increase capacity (Ch 9000-9400<br />

east of Kairua Road)<br />

Activity in the Bed Discretionary <strong>Mangatawa</strong> Drain realignment at<br />

railway (includes erosion<br />

protection, gabion baskets)<br />

3 NZTA TCC<br />

1 NZTA TCC<br />

5, 6 NZTA<br />

Placing Culverts –Rules 59 to 59D, Form 1<br />

Culverts<br />

Restricted<br />

Discretionary<br />

Installation of culverts at Ch 6850<br />

from Maranui Swale to <strong>Mangatawa</strong><br />

Drain<br />

9 NZTA<br />

Culvert Extensions<br />

Restricted<br />

Discretionary<br />

Extension of culverts under Kairua<br />

Road<br />

11 NZTA<br />

Culvert Permitted Install an 1800 dia culvert at<br />

Ch 5900 on MPBI land in an open<br />

12 TCC<br />

Status: Final Page 39 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE