2. Mangatawa catchment consents for earthworks, storm water ...
2. Mangatawa catchment consents for earthworks, storm water ...
2. Mangatawa catchment consents for earthworks, storm water ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NZ Transport Agency and Tauranga City Council<br />
<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />
Form 2<br />
Land disturbing activities<br />
(<strong>earthworks</strong>, quarrying, vegetation<br />
clearance, harvesting, burning)<br />
Question 7<br />
Assessment of effects on the environment (AEE)<br />
Section 88 of the Resource Management Act 1991 requires all applications <strong>for</strong> resource<br />
<strong>consents</strong> to include an assessment of the actual or potential effects that the proposed<br />
activity may have on the environment and the ways in which any adverse effects can be<br />
mitigated. The Fourth Schedule of the Act lists the matters that should be included in such<br />
assessments and a summary is printed on the back of the application <strong>for</strong>m.<br />
You must fully complete this section or your application cannot be processed.<br />
The in<strong>for</strong>mation you supply should be detailed according to the scale, scope and effects of<br />
the proposed activity.<br />
Applicants <strong>for</strong> small scale proposals having minor effects should be able to supply sufficient<br />
in<strong>for</strong>mation by filling in the spaces provided. More complex proposals with more significant<br />
effects will need to address the following matters (in accordance with the Fourth Schedule)<br />
as a separate document.<br />
If the AEE is presented in the <strong>for</strong>mat of a report, it must address the following matters, if<br />
appropriate.<br />
If you are unsure how to complete this section please contact an environmental <strong>consents</strong><br />
officer at Environment Bay of Plenty.<br />
1 Description of the proposal<br />
a) What is the nature of the activity you propose to undertake?<br />
• Activity related to the management of TEM <strong>storm</strong><strong>water</strong> and associated works.<br />
• Activity related to Flood mitigation measures <strong>for</strong> the <strong>Mangatawa</strong> <strong>catchment</strong> and associated<br />
works<br />
• Also see “Description of the Proposal” and “Construction Methodology” in application.<br />
b) What is the scale of the proposal?<br />
The Earthworks required <strong>for</strong> the TEM project has been applied <strong>for</strong> in a previous application. The<br />
<strong>earthworks</strong> required <strong>for</strong> this application are associated with the <strong>Mangatawa</strong> Floodway construction<br />
and Storm<strong>water</strong> wetland construction and are referred to specifically in the text of this document.<br />
The total volume of <strong>earthworks</strong> required to be undertaken is approximately between 45,000m³ -<br />
60,000m³ <strong>for</strong> the TEM component of the works only. See section 9.<strong>2.</strong><br />
Status: Final Page 16 April 2009<br />
Project Number: 3932036<br />
NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE