01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6<br />

U14/1708 & 1709<br />

Figure 3. Cadastral plan and aerial photo showing the location of recorded archaeological sites<br />

U14/1708 & 1709 in relation to SH<strong>2.</strong><br />

U14/1708 & 1709<br />

SH2<br />

Figure 4. Part survey plan ML 7136 produced in 1904 showing the location of U14/1708 & 1709,<br />

the approximate alignment of SH2 and the intervening wetland.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!