01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

(e.g. <strong>storm</strong><strong>water</strong> control, river works, stream realignment, etc.)<br />

• To control the spill of flood <strong>water</strong>s over the State Highway at 2 locations - See application and<br />

appendices <strong>for</strong> details.<br />

3 What is the name of the <strong>water</strong>course to be diverted?<br />

• <strong>Mangatawa</strong> Drain<br />

4 What is the rate at which <strong>water</strong> will be diverted?<br />

• The flow rate of the diversion is not a significant effect of this activity and does not need to be<br />

assessed in this manner. The application project description and AEE sections will outline the<br />

effects of this application.<br />

5 Will the diversion be:<br />

intermittent<br />

or continuous?<br />

If intermittent, what will be the maximum operating period?<br />

• See project description in application<br />

6 Does the diversion also involve:<br />

Taking <strong>water</strong>?<br />

Yes<br />

No<br />

Damming <strong>water</strong>?<br />

Yes<br />

No<br />

Discharging?<br />

Yes<br />

No<br />

Any Structures?<br />

Yes<br />

No<br />

If you answered Yes to any of 6 above, a separate consent application may be required.<br />

7 Where your diversion could have a significant adverse effect on the environment a more detailed<br />

environmental assessment is required in accordance with the Fourth Schedule of the Resource<br />

Management Act 1991.<br />

7.1 Will the diversion have an effect on <strong>water</strong> availability to downstream users and/or affect access to<br />

neighbouring properties?<br />

Yes<br />

No<br />

Status: Final Page 22 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!