NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

If you answered Yes to any of the above, a separate consent application may be required.<br />

3 Assessment of effects on the environment<br />

Where your discharge could have a significant adverse effect on the environment a more detailed<br />

environmental assessment is required in accordance with the Fourth Schedule of the Resource<br />

Management Act 1991.<br />

a) Comment on the possible effect the discharge may have on the quality of the receiving<br />

environment and users:<br />

• See assessment of effects section in application<br />

b) Within a reasonable distance downstream, down ground<strong>water</strong> gradient or in the vicinity of the<br />

discharge are there any:<br />

1 Obvious signs of biota (e.g. fish, eels, insect life, aquatic plants) Yes No<br />

2 Areas where food is gathered Yes No<br />

3 Water abstractions Yes No<br />

4 Wetlands Yes No<br />

5 Recreational activities carried out Yes No<br />

6 Areas of particular aesthetic or scientific value (e.g. archaeological sites) Yes No<br />

7 Areas or aspects of significance to Iwi Yes No<br />

If you have answered yes to any of the above, describe what effects your discharge may have and<br />

the steps you propose to take to avoid or mitigate these.<br />

• See assessment of effects section in application<br />

4 Alternatives<br />

a) What alternative methods of disposal or discharge locations have you considered?<br />

• See project description of the detailed options assessment undertaken as apart of this project.<br />

Please the technical report appendix <strong>for</strong><br />

b) Why did you choose the proposed method of disposal and location point?<br />

• See project description in application<br />

5 Maintenance and contingency<br />

Status: Final Page 27 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE