• Installation of Stage 2 decanting earth bund;<br />

• Stage 2 <strong>earthworks</strong>;<br />

• Progressively stabilise completed areas as soon as practicable.<br />

Storm<strong>water</strong> Wetland<br />

• Construction of perimeter controls such as silt fences;<br />

• Stage 1 <strong>earthworks</strong>;<br />

• Stage 2 <strong>earthworks</strong>;<br />

• Construction of dam weir;<br />

• Diversion of clean <strong>water</strong> entering wetland through the new Stage 2 channels;<br />

• Stage 3 <strong>earthworks</strong>;<br />

• Construction of outlet;<br />

• Progressively stabilise completed areas as soon as practicable;<br />

• Construction of perimeter controls such as silt fences and bund in Phase 2;<br />

• Phase 2 <strong>earthworks</strong>;<br />

• Open Phase 2 to Phase 1.<br />

5 Monitoring and Maintenance<br />

Erosion and sediment control measures will be installed, monitored and maintained throughout the<br />

works until the site is stabilised. The table below outlines inspection and maintenance requirements<br />

<strong>for</strong> erosion and sediment controls that are to be implemented in this ESCP.<br />

Control Type Inspection and Maintenance Requirements Frequency<br />

Silt fence • Check that silt fences are toed in correctly.<br />

• Check <strong>for</strong> tears and other damage.<br />

• Any areas of collapse, decomposition or ineffectiveness<br />

are to be replaced immediately.<br />

• Remove silt build ups when bulges develop or when<br />

deposition reaches 50% of the silt fence height.<br />

Diversion<br />

bunds and<br />

channels<br />

Sediment<br />

Retention<br />

Pond<br />

Decanting<br />

Earth Bund<br />

• Ensure they are in the correct place (clean <strong>water</strong><br />

diverting flows away from the work area and sedimentladen<br />

flows directed to sediment treatment devices).<br />

• Inspect <strong>for</strong> signs of scouring or collapse and repair<br />

immediately if required.<br />

• Remove any material that may have accumulated.<br />

• General inspection<br />

• Clean out sediment build up in <strong>for</strong>ebay<br />

• Check outlet <strong>for</strong> blockages<br />

• Check level spreader<br />

• Check discharge points <strong>for</strong> scour<br />

• Check that outlet is not blocked<br />

• Remove built up sediment from around base<br />

Daily<br />

Daily<br />

As required<br />

As required<br />

Daily<br />

Daily<br />

As required<br />

Weekly<br />

As required<br />

Weekly<br />

Weekly<br />

Weekly<br />

Daily<br />

As required<br />

Regularly and<br />

Beca // 1 April 2009 // Page 11<br />

3932036 // NZ1-1453076-10 0.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!