- Page 1 and 2:
Mangatawa Drain Flood Bypass and TE
- Page 3 and 4:
NZ Transport Agency and Tauranga Ci
- Page 5 and 6:
NZ Transport Agency and Tauranga Ci
- Page 7 and 8:
NZ Transport Agency and Tauranga Ci
- Page 9 and 10:
NZ Transport Agency and Tauranga Ci
- Page 11 and 12:
NZ Transport Agency and Tauranga Ci
- Page 13 and 14:
NZ Transport Agency and Tauranga Ci
- Page 16 and 17:
NZ Transport Agency and Tauranga Ci
- Page 18 and 19:
NZ Transport Agency and Tauranga Ci
- Page 20 and 21:
NZ Transport Agency and Tauranga Ci
- Page 22 and 23:
NZ Transport Agency and Tauranga Ci
- Page 24 and 25:
NZ Transport Agency and Tauranga Ci
- Page 26 and 27:
NZ Transport Agency and Tauranga Ci
- Page 28 and 29:
NZ Transport Agency and Tauranga Ci
- Page 30 and 31:
NZ Transport Agency and Tauranga Ci
- Page 32 and 33:
NZ Transport Agency and Tauranga Ci
- Page 34 and 35:
NZ Transport Agency and Tauranga Ci
- Page 36 and 37:
NZ Transport Agency and Tauranga Ci
- Page 38 and 39:
NZ Transport Agency and Tauranga Ci
- Page 40 and 41:
NZ Transport Agency and Tauranga Ci
- Page 43:
NZ Transport Agency and Tauranga Ci
- Page 46 and 47:
NZ Transport Agency and Tauranga Ci
- Page 48 and 49:
NZ Transport Agency and Tauranga Ci
- Page 50 and 51:
NZ Transport Agency and Tauranga Ci
- Page 52 and 53:
NZ Transport Agency and Tauranga Ci
- Page 54 and 55:
NZ Transport Agency and Tauranga Ci
- Page 56 and 57:
NZ Transport Agency and Tauranga Ci
- Page 58 and 59:
NZ Transport Agency and Tauranga Ci
- Page 60 and 61:
NZ Transport Agency and Tauranga Ci
- Page 62 and 63:
NZ Transport Agency and Tauranga Ci
- Page 64 and 65:
NZ Transport Agency and Tauranga Ci
- Page 66 and 67:
NZ Transport Agency and Tauranga Ci
- Page 68 and 69:
NZ Transport Agency and Tauranga Ci
- Page 70 and 71:
NZ Transport Agency and Tauranga Ci
- Page 72 and 73:
NZ Transport Agency and Tauranga Ci
- Page 74 and 75:
NZ Transport Agency and Tauranga Ci
- Page 76 and 77:
NZ Transport Agency and Tauranga Ci
- Page 78 and 79:
NZ Transport Agency and Tauranga Ci
- Page 80 and 81:
NZ Transport Agency and Tauranga Ci
- Page 82 and 83:
NZ Transport Agency and Tauranga Ci
- Page 84 and 85:
NZ Transport Agency and Tauranga Ci
- Page 86 and 87:
NZ Transport Agency and Tauranga Ci
- Page 88 and 89:
NZ Transport Agency and Tauranga Ci
- Page 90 and 91:
NZ Transport Agency and Tauranga Ci
- Page 92 and 93:
NZ Transport Agency and Tauranga Ci
- Page 94 and 95:
NZ Transport Agency and Tauranga Ci
- Page 96 and 97:
NZ Transport Agency and Tauranga Ci
- Page 98 and 99:
NZ Transport Agency and Tauranga Ci
- Page 100 and 101:
NZ Transport Agency and Tauranga Ci
- Page 102 and 103:
NZ Transport Agency and Tauranga Ci
- Page 104 and 105:
NZ Transport Agency and Tauranga Ci
- Page 106 and 107:
NZ Transport Agency and Tauranga Ci
- Page 108 and 109:
NZ Transport Agency and Tauranga Ci
- Page 110 and 111:
NZ Transport Agency and Tauranga Ci
- Page 112 and 113:
NZ Transport Agency and Tauranga Ci
- Page 114 and 115:
NZ Transport Agency and Tauranga Ci
- Page 116:
APPENDIX 1 - Drawing 3932036 ck301R
- Page 120:
APPENDIX 3 - Drawing 3932036 ck119
- Page 126:
APPENDIX 5 - Bioresearches Report:
- Page 206 and 207: ARCHAEOLOGICAL SURVEY AND ASSESSMEN
- Page 208 and 209: 1 CONTENTS INTRODUCTION 2 Project B
- Page 210 and 211: 3 Methodology Prior to the archaeol
- Page 212 and 213: 5 Figure 2. Part topographic map U1
- Page 214 and 215: 7 U14/1842 - Artifact Find Spot Thi
- Page 216 and 217: 9 U14/2309 Artifact Find Spot This
- Page 218 and 219: 11 Figure 10. Beca plan 3932036-G03
- Page 220 and 221: 13 DISCUSSION AND CONCLUSIONS Summa
- Page 222 and 223: 15 RECOMMENDATIONS The following re
- Page 224 and 225: Report Hydraulic Modelling: Mangata
- Page 226 and 227: 1 Project Description 1.1 Introduct
- Page 228 and 229: The Wairakei catchment was not incl
- Page 230 and 231: currently leased by TCC for the Mar
- Page 232 and 233: • Added primary drain cross-secti
- Page 234 and 235: Table 3 - Catchment rainfall depth
- Page 236 and 237:
It should be noted that while the T
- Page 238 and 239:
increase in spill rate from the Mar
- Page 240 and 241:
The total volume of water spilling
- Page 242 and 243:
water up to a third of a 50% AEP (w
- Page 244 and 245:
• The spills into Papamoa urban a
- Page 247:
Appendix B Mangatawa Drain Layout O
- Page 253:
Appendix D Longsection of Hydraulic
- Page 257:
APPENDIX 9 - Drawings 3932036 ck143
- Page 270:
APPENDIX 11 - Drawing 3932036 ck431
- Page 274 and 275:
APPENDIX 13 - Example Erosion and S
- Page 276 and 277:
Table of Contents 1 Introduction...
- Page 278 and 279:
• Peat - comprises organic materi
- Page 280 and 281:
The longest section of culvert work
- Page 282 and 283:
7 Protect critical areas. 8 Inspect
- Page 284 and 285:
. Sandhurst The installation of the
- Page 286 and 287:
the public road it will be removed
- Page 288 and 289:
• Make sure bund is stabilised
- Page 294 and 295:
APPENDIX 14 - Regional Water and La
- Page 296 and 297:
Policy 5, 14, 15, 17, 18, 20, 21, 5
- Page 298 and 299:
1. Not permitted by a rule in this
- Page 300 and 301:
(f) The resource consent applicant
- Page 302 and 303:
FULL_APP Papamoa 2No8B2B2 Papamoa 2
- Page 304:
APPENDIX 16 - Existing TCC Discharg
- Page 312 and 313:
Page 2 3 September 2009 “The cons