01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

1.2 Joint Application<br />

This report will assess the combined effects of this project. The various <strong>consents</strong> required need to be held<br />

separately by either NZTA or TCC <strong>for</strong> the purposes of clearly assigning responsibilities <strong>for</strong> the effects of these<br />

activities. The consent requirements are split between Tauranga City Council and the New Zealand Transport<br />

Agency. It is important to understand that in the issuing of any consent, the Regional Council will be<br />

assigning the responsibility <strong>for</strong> the effects of the activities related to those <strong>consents</strong> to either NZTA or TCC.<br />

The split has been decided and agreed upon by both the organisations applying <strong>for</strong> <strong>consents</strong>.<br />

1.3 Structure of the Report<br />

The key sections of this report are the description of the proposal which is found in Section 7 and the<br />

assessment of the environmental effects in Section 9.<br />

Status: Final Page 2 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!