- Page 1 and 2: Mangatawa Drain Flood Bypass and TE
- Page 3 and 4: NZ Transport Agency and Tauranga Ci
- Page 5 and 6: NZ Transport Agency and Tauranga Ci
- Page 7 and 8: NZ Transport Agency and Tauranga Ci
- Page 9 and 10: NZ Transport Agency and Tauranga Ci
- Page 11 and 12: NZ Transport Agency and Tauranga Ci
- Page 13: NZ Transport Agency and Tauranga Ci
- Page 17 and 18: NZ Transport Agency and Tauranga Ci
- Page 19 and 20: NZ Transport Agency and Tauranga Ci
- Page 21 and 22: NZ Transport Agency and Tauranga Ci
- Page 23 and 24: NZ Transport Agency and Tauranga Ci
- Page 25 and 26: NZ Transport Agency and Tauranga Ci
- Page 27 and 28: NZ Transport Agency and Tauranga Ci
- Page 29 and 30: NZ Transport Agency and Tauranga Ci
- Page 31 and 32: NZ Transport Agency and Tauranga Ci
- Page 33 and 34: NZ Transport Agency and Tauranga Ci
- Page 35 and 36: NZ Transport Agency and Tauranga Ci
- Page 37 and 38: NZ Transport Agency and Tauranga Ci
- Page 39 and 40: NZ Transport Agency and Tauranga Ci
- Page 41: NZ Transport Agency and Tauranga Ci
- Page 45 and 46: NZ Transport Agency and Tauranga Ci
- Page 47 and 48: NZ Transport Agency and Tauranga Ci
- Page 49 and 50: NZ Transport Agency and Tauranga Ci
- Page 51 and 52: NZ Transport Agency and Tauranga Ci
- Page 53 and 54: NZ Transport Agency and Tauranga Ci
- Page 55 and 56: NZ Transport Agency and Tauranga Ci
- Page 57 and 58: NZ Transport Agency and Tauranga Ci
- Page 59 and 60: NZ Transport Agency and Tauranga Ci
- Page 61 and 62: NZ Transport Agency and Tauranga Ci
- Page 63 and 64: NZ Transport Agency and Tauranga Ci
- Page 65 and 66:
NZ Transport Agency and Tauranga Ci
- Page 67 and 68:
Table 9: Summary of Ecological Char
- Page 69 and 70:
NZ Transport Agency and Tauranga Ci
- Page 71 and 72:
NZ Transport Agency and Tauranga Ci
- Page 73 and 74:
NZ Transport Agency and Tauranga Ci
- Page 75 and 76:
NZ Transport Agency and Tauranga Ci
- Page 77 and 78:
NZ Transport Agency and Tauranga Ci
- Page 79 and 80:
NZ Transport Agency and Tauranga Ci
- Page 81 and 82:
NZ Transport Agency and Tauranga Ci
- Page 83 and 84:
NZ Transport Agency and Tauranga Ci
- Page 85 and 86:
NZ Transport Agency and Tauranga Ci
- Page 87 and 88:
NZ Transport Agency and Tauranga Ci
- Page 89 and 90:
NZ Transport Agency and Tauranga Ci
- Page 91 and 92:
NZ Transport Agency and Tauranga Ci
- Page 93 and 94:
NZ Transport Agency and Tauranga Ci
- Page 95 and 96:
NZ Transport Agency and Tauranga Ci
- Page 97 and 98:
NZ Transport Agency and Tauranga Ci
- Page 99 and 100:
NZ Transport Agency and Tauranga Ci
- Page 101 and 102:
NZ Transport Agency and Tauranga Ci
- Page 103 and 104:
NZ Transport Agency and Tauranga Ci
- Page 105 and 106:
NZ Transport Agency and Tauranga Ci
- Page 107 and 108:
NZ Transport Agency and Tauranga Ci
- Page 109 and 110:
NZ Transport Agency and Tauranga Ci
- Page 111 and 112:
NZ Transport Agency and Tauranga Ci
- Page 113 and 114:
NZ Transport Agency and Tauranga Ci
- Page 115 and 116:
NZ Transport Agency and Tauranga Ci
- Page 118:
APPENDIX 2 - Extract from Tauranga
- Page 122:
APPENDIX 4 - Drawings 3932036 ck073
- Page 185:
APPENDIX 6 - Ngaiterangi Cultural I
- Page 206 and 207:
ARCHAEOLOGICAL SURVEY AND ASSESSMEN
- Page 208 and 209:
1 CONTENTS INTRODUCTION 2 Project B
- Page 210 and 211:
3 Methodology Prior to the archaeol
- Page 212 and 213:
5 Figure 2. Part topographic map U1
- Page 214 and 215:
7 U14/1842 - Artifact Find Spot Thi
- Page 216 and 217:
9 U14/2309 Artifact Find Spot This
- Page 218 and 219:
11 Figure 10. Beca plan 3932036-G03
- Page 220 and 221:
13 DISCUSSION AND CONCLUSIONS Summa
- Page 222 and 223:
15 RECOMMENDATIONS The following re
- Page 224 and 225:
Report Hydraulic Modelling: Mangata
- Page 226 and 227:
1 Project Description 1.1 Introduct
- Page 228 and 229:
The Wairakei catchment was not incl
- Page 230 and 231:
currently leased by TCC for the Mar
- Page 232 and 233:
• Added primary drain cross-secti
- Page 234 and 235:
Table 3 - Catchment rainfall depth
- Page 236 and 237:
It should be noted that while the T
- Page 238 and 239:
increase in spill rate from the Mar
- Page 240 and 241:
The total volume of water spilling
- Page 242 and 243:
water up to a third of a 50% AEP (w
- Page 244 and 245:
• The spills into Papamoa urban a
- Page 247:
Appendix B Mangatawa Drain Layout O
- Page 253:
Appendix D Longsection of Hydraulic
- Page 257:
APPENDIX 9 - Drawings 3932036 ck143
- Page 270:
APPENDIX 11 - Drawing 3932036 ck431
- Page 274 and 275:
APPENDIX 13 - Example Erosion and S
- Page 276 and 277:
Table of Contents 1 Introduction...
- Page 278 and 279:
• Peat - comprises organic materi
- Page 280 and 281:
The longest section of culvert work
- Page 282 and 283:
7 Protect critical areas. 8 Inspect
- Page 284 and 285:
. Sandhurst The installation of the
- Page 286 and 287:
the public road it will be removed
- Page 288 and 289:
• Make sure bund is stabilised
- Page 294 and 295:
APPENDIX 14 - Regional Water and La
- Page 296 and 297:
Policy 5, 14, 15, 17, 18, 20, 21, 5
- Page 298 and 299:
1. Not permitted by a rule in this
- Page 300 and 301:
(f) The resource consent applicant
- Page 302 and 303:
FULL_APP Papamoa 2No8B2B2 Papamoa 2
- Page 304:
APPENDIX 16 - Existing TCC Discharg
- Page 312 and 313:
Page 2 3 September 2009 “The cons