NZ Transport Agency and Tauranga City Council<br />
<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />
Table 2: Regional Coastal Environmental Plan Consents Required and Ownership Status of each Consent<br />
TCC and TEM Storm<strong>water</strong> Treatment Wetland<br />
Consent Required Status Activity<br />
Variation to existing Regional Coastal Consent RC 60061<br />
Plan<br />
Ref<br />
Proposed<br />
Consent Holder<br />
10yrs 35yrs<br />
Variation to discharge<br />
into the CMA<br />
Variation<br />
Increase in the volume of<br />
discharge from Tauranga City<br />
Council treatment wetland, RC<br />
60061.<br />
TCC<br />
From 3.9 Cubic metres a second,<br />
except when the 24 hour duration<br />
1 in 5 year return <strong>storm</strong> event is<br />
exceeded, to 13.4 cubic metres a<br />
second<br />
Discharges into the CMA Discretionary Discharge from lower <strong>Mangatawa</strong><br />
drain to harbour.<br />
9 TCC<br />
4.3 District Plan Activity Status<br />
The proposed enlargement to the <strong>storm</strong><strong>water</strong> treatment wetland is located immediately north (outside) of<br />
Special Ecological Site 13s described in Table 3. The proposed works are outside the SES area and as such the<br />
rules apply to activities within or adjacent to the SES.<br />
Table 3: TCC District Plan General Natural Resource Rules - Maintaining Biodiversity and Protecting<br />
Ecosystems<br />
Appendix 14A: Special Ecological Site Register<br />
Map<br />
No.<br />
Eco.<br />
Site<br />
ID<br />
General Description<br />
ES13 12 Head of Rangataua Bay, northwest<br />
of sewage treatment plant<br />
Natural Heritage Values<br />
Estuarine wetland with transition<br />
vegetation sequence of mangroves<br />
through fresh<strong>water</strong> wetland.<br />
Habitat of banded rail and North<br />
Island fernbird, habitat of high quality.<br />
Significant amounts of <strong>earthworks</strong> and vegetation removal are required as part of the proposal. These activities<br />
are non complying activities subject to Rule 14.1 (b) and (c) which state:<br />
Status: Final Page 41 April 2009<br />
Project Number: 3932036<br />
NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE