01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

9.2 Earthworks<br />

The Earthworks <strong>for</strong> the construction of the TEM embankment and associated swales has been assessed and<br />

considered at a hearing finishing on December 18th 2008. This application will address the earthwork effects<br />

related to the construction of the <strong>Mangatawa</strong> Catchment Storm<strong>water</strong> management.<br />

The total volume of <strong>earthworks</strong> required to be undertaken is approximately between 45,000m³ - 60,000m³.<br />

NOTE: This excludes the works which will be subject to a separate resource consent application.<br />

The effects of <strong>earthworks</strong> and construction can result in increased, erosion, sedimentation, nutrient levels in<br />

riparian margins and <strong>water</strong>ways as well as more human effects such as increased noise, dust and vibration.<br />

This can have an adverse have an adverse effect on ecological values, cultural values, natural character and<br />

landscapes.<br />

9.<strong>2.</strong>1 Ecological Effects from Construction<br />

For this proposal there is a potential temporary adverse effect on the ecology of the fresh<strong>water</strong> habitats in the<br />

downstream receiving environments, through sediment inputs from construction and maintenance operations.<br />

During construction the main activities with the potential to generate harmful ecological impacts are:<br />

1. Works in the bed of the upper <strong>Mangatawa</strong> Drain<br />

<strong>2.</strong> Construction of the <strong>storm</strong><strong>water</strong> treatment wetland<br />

3. Construction of the earth stopbank on the Lower <strong>Mangatawa</strong> Drain<br />

NZTA and TCC will seek to manage and mitigate these effects through establishing environmental bottom lines<br />

in its contract documents with the contractor.<br />

It is recognised that the upper and lower drain has significant importance to the local community. The use of<br />

the drain to eel and catch white bait was raised during consultation and to support this activity works in the<br />

bed of the stream will be undertaken outside fish spawning periods to lessen the impacts of this disturbance.<br />

Works to improve and stabilise the drain alignment past the railway bridge, using gabion baskets and reno<br />

mattresses, will be undertaken as quickly as possible to minimise disturbance. The banks of the drain will be<br />

re-established and planted as soon as is practicable after the activity takes place and it is proposed that any<br />

complaints and or issues that the community may have be dealt with quickly and directly with the contractor<br />

through a complaints phone line set up <strong>for</strong> this project.<br />

The result of these mitigation measures will mean that the effects of this activity will be no more than minor.<br />

The construction of the <strong>storm</strong><strong>water</strong> treatment wetland will take place next to the SES as described in the<br />

project description. Using a Construction Management Plan (CMP) as defined below will address many of the<br />

issues related to <strong>earthworks</strong> <strong>for</strong> this and other <strong>earthworks</strong> activity.<br />

Status: Final Page 89 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!