NZ Transport Agency and Tauranga City Council<br />
<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />
• The quality of <strong>storm</strong><strong>water</strong> discharge and its effects on Tauranga Harbour.<br />
• One suggestion was that the <strong>storm</strong><strong>water</strong> from the TEM be conveyed westwards to the other side of the Bay<br />
Park Stadium to a TCC pond and wetland be<strong>for</strong>e reaching the harbour. This option was considered by the<br />
engineers and discounted due to cost and feasibility of achieving this outcome as shown in the attached<br />
options report.<br />
Ngati Pukenga<br />
A hui was held with Ngati Pukenga on 15th of February 2009. Representatives of the hapu met with members<br />
of project team, NZTA and TCC. The following issues were raised.<br />
• Water quality of the discharge to the harbour<br />
• Flooding effects on the farmlands beside the State highway especially Kairua Rd flooding<br />
• The significance of harbour shellfish and the need to protect the habitat<br />
• Long term effects of <strong>storm</strong><strong>water</strong> run off sedimentation contamination<br />
• White baiting and the fish spawning periods <strong>for</strong> white bait on the lower drain and opportunity to encourage<br />
the fishery there by enhancement<br />
• <strong>Mangatawa</strong> <strong>catchment</strong> land flooding residence times<br />
A copy of the AEE will be provided and should any additional consultation responses be received that will be<br />
<strong>for</strong>warded to EBOP and TCC.<br />
Ngati He<br />
Ngati He was contacted regarding the <strong>Mangatawa</strong> application on the 9 th February 2009. They requested to be<br />
sent a newsletter regarding the proposal <strong>for</strong> dissemination at a hapu meeting and the draft application when<br />
finalised. A copy of the AEE will be provided and should any additional consultation responses be received that<br />
will be <strong>for</strong>warded to EBOP and TCC.<br />
Waitaha<br />
At the TEM Tangata Whenua Advisory Group meeting in February Waitaha requested a copy of the AEE and may<br />
provide comment.<br />
Ngai Tukairangi<br />
Ngai Tukairangi representatives were contacted on the 19 th of December 2008 and sent in<strong>for</strong>mation to present<br />
at an internal hapu meeting. Members of the hapu were asked to express any concerns with the proposal and<br />
contact the project team. No concerns were raised with the project team and the hapu representatives were<br />
sent more material in case other members became interested.<br />
Status: Final Page 80 April 2009<br />
Project Number: 3932036<br />
NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE