Hydraulic Modelling: <strong>Mangatawa</strong> Drain/Maranui Swale - Mitigation Options<br />
Table of Contents<br />
1 Project Description.................................................................................................1<br />
1.1 Introduction.................................................................................................................. 1<br />
1.2 Background ................................................................................................................. 1<br />
1.3 <strong>Mangatawa</strong> Flood Risk and Storm<strong>water</strong> Management ............................................... 3<br />
1.4 Outlet Options Considered .......................................................................................... 3<br />
1.5 Floodway Concepts..................................................................................................... 5<br />
2 Model Studies .........................................................................................................6<br />
<strong>2.</strong>1 Modelling Stage........................................................................................................... 6<br />
<strong>2.</strong>2 Hydrological Assessment ............................................................................................ 8<br />
<strong>2.</strong>3 Rainfall......................................................................................................................... 8<br />
<strong>2.</strong>4 Hydraulic Model......................................................................................................... 10<br />
<strong>2.</strong>5 Results....................................................................................................................... 11<br />
3 Proposed Flood Risk Mitigation Measures ........................................................15<br />
3.1 Increased Drain Storage............................................................................................ 15<br />
3.2 Top Spill Stop Bank................................................................................................... 15<br />
3.3 Maintenance Work in <strong>Mangatawa</strong> Drain ................................................................... 16<br />
3.4 Bruce Road Barrier / Bund ........................................................................................ 16<br />
3.5 Lower Rail Bridge Embankment Stability .................................................................. 16<br />
3.6 Flood Bypass from Maranui to <strong>Mangatawa</strong>............................................................... 16<br />
3.7 Lower <strong>Mangatawa</strong> Drain Works ................................................................................ 17<br />
3.8 Sandhurst Culvert...................................................................................................... 17<br />
3.9 Extension of Maranui Culvert .................................................................................... 17<br />
3.10 Maranui Deepening ................................................................................................... 17<br />
3.11 Storm<strong>water</strong> Treatment Wetland Area........................................................................ 17<br />
4 Conclusions ..........................................................................................................18<br />
Appendices<br />
Appendix A – <strong>Mangatawa</strong> Drain Layout Plan<br />
Appendix B – <strong>Mangatawa</strong> Drain Layout Option 2<br />
Appendix C – Runoff hydrographs<br />
Appendix D – Longsection of hydraulic grade line<br />
Appendix E – Proposed Lower <strong>Mangatawa</strong> Drain and Maranui treatment area<br />
Beca // 17 March 2009 // Page ii<br />
3932036 // NZ1-1604459-15 0.15 Rev A