32 Harington Street<br />

PO Box 903, Tauranga 3140, New Zealand<br />

T: +64 7 578 0896 // F: +64 7 578 2968<br />

E: info@beca.com // www.beca.com<br />

Environment BOP<br />

PO Box 364<br />

Whakatane<br />

3 September 2009<br />

Attention: Dudley Clemens<br />

Dear Dudley<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEL Storm<strong>water</strong> AEE<br />

Further to our discussions with you and in view of Jo Bain’s email on the 04/09/09, we confirm the<br />

return of the Phase 2 wetland <strong>earthworks</strong> activity to construct the wetland in our joint application <strong>for</strong><br />

Resource Consent submitted on behalf of NZ Transport Agency and Tauranga City Council. We<br />

seek to alter the <strong>earthworks</strong> volumes in application and wish to make the following alterations to the<br />

lodged AEE.<br />

Page 16<br />

The last two lines should read:<br />

“The total volume of <strong>earthworks</strong> required to be undertaken is approximately between<br />

61,000m 3 – 80,000m 3 <strong>for</strong> the TEM component of the works only. See section 9.<strong>2.</strong>”<br />

Page 71<br />

The second bullet point should have the last sentence deleted, i.e. it should read:<br />

“The total volume of <strong>earthworks</strong> required <strong>for</strong> TCC works in the proposed <strong>storm</strong><strong>water</strong><br />

treatment wetland is 16,000m 3 – 20,000m 3 .” Deleted – This will be the subject of a future<br />

application.<br />

Section 9.2, page 89<br />

The second paragraph should read:<br />

“The total volume of <strong>earthworks</strong> required to be undertaken is approximately 61,000m 3 –<br />

80,000m 3 .”<br />

Section 9.2, page 90<br />

Insert after the first paragraph the following text:<br />

Our Ref: 3932036<br />

NZ1-2111967-3 0.3