NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

into the drain per<strong>for</strong>mance. They produced three reports 1 and the last was after the May 2005 floods. As part<br />

of their work a MIKE11 hydraulic model was built. New Zealand Transport Agency (NZTA) has been working<br />

with TCC to find a solution which will avoid or at least reduce overflows. The aim <strong>for</strong> NZTA was to avoid if<br />

practicable the 1% annual exceedance probability (AEP) <strong>storm</strong> event overtopping and overflowing the<br />

motorway, while TCC’s aim was to reduce the volume of <strong>water</strong> that would enter the Papamoa <strong>catchment</strong> areas<br />

(Maranui Swale and the Wairakei Stream) such that the design flood level <strong>for</strong> Papamoa of 4.5m RL (Moturiki<br />

Datum), as defined in the District Plan, was not exceeded in the 2% AEP <strong>storm</strong> event. Beca was appointed to<br />

adopt the Opus hydraulic model and undertake further modelling and engineering work to investigate<br />

mitigation options, as an extension to the work they were carrying out <strong>for</strong> NZTA on the TEM.<br />

<strong>2.</strong>4 Existing Statutory Approvals<br />

Currently there are no resource <strong>consents</strong> <strong>for</strong> the management of <strong>storm</strong><strong>water</strong> generated by State Highway 2 or<br />

<strong>for</strong> the <strong>Mangatawa</strong> drain discharge to the Tauranga Harbour. However the <strong>Mangatawa</strong> Drain is defined as<br />

Land Drainage canal in the Regional Water and Land Plan 2 .<br />

The TCC treatment wetland that receives <strong>storm</strong><strong>water</strong> from the Maranui <strong>catchment</strong> has consent <strong>for</strong> discharge<br />

which needs to be varied as part of this application.<br />

The over spill into the Wairakei <strong>catchment</strong> is currently covered by the Wairakei Catchment comprehensive<br />

consent which is currently subject to appeal.<br />

<strong>2.</strong>4.1 TEM Designations previously gained by New Zealand Transport Agency<br />

The designated corridor <strong>for</strong> the motorway has been in place since 2004 and was designated in four parts. It<br />

consists of designations <strong>for</strong>:<br />

• Te Maunga Four Laning<br />

• Te Maunga Service Roads<br />

• Sandhurst Interchange<br />

• Tauranga Eastern Arterial.<br />

The designations are now collectively referred to as the TEM. The designations that relate to this project area<br />

are Te Maunga four laning and Sandhurst Interchange.<br />

1 <strong>Mangatawa</strong> Drain Flood Capacity, September 2000; <strong>Mangatawa</strong> Drain Flood Capacity: Supplementary Report, July 2001;<br />

and <strong>Mangatawa</strong> Drain Flood Assessment, 29 November 2006; all produced by Opus International Consultants Ltd<br />

2 RWLP Dec 2002, Definitions Chapter, Pg 436. Land Drainage Canal.<br />

Status: Final Page 5 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE