01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 2<br />

3 September 2009<br />

“The construction of the Phase 2 and 3 components of the <strong>storm</strong><strong>water</strong> treatment wetland will<br />

be subject to the same mitigation measures employed by the rest of the TEL project as<br />

described above.”<br />

Appendix 10<br />

Drawing Nº’s 3932036-CK460 Rev A and 3932036-CK460 Rev A are to be replaced with new<br />

Drawing Nº’s 3932036-CK460 Rev C and 3932036-CK460 Rev B<br />

Please use this letter and attached drawings as a reference addendum to the main application. If<br />

you have any queries please contact the undersigned on 5771129.<br />

Please note that the lodged AEE contains all the relevant environmental assessment <strong>for</strong> <strong>earthworks</strong><br />

<strong>for</strong> phase 2 and 3 of the wetland construction.<br />

Yours sincerely<br />

Christine Ralph<br />

Technical Director<br />

on behalf of<br />

Beca Infrastructure Limited<br />

Direct Dial: +64-7-577 1129<br />

Email: christine.ralph@beca.com<br />

Copy<br />

TCC, NZTA<br />

Our Ref: 3932036<br />

NZ1-2111967-3 0.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!