NZ Transport Agency and Tauranga City Council<br />
<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />
Form 5<br />
Dam / divert / use <strong>water</strong><br />
Question 7<br />
Assessment of effects on the environment (AEE)<br />
Section 88 of the Resource Management Act 1991 requires all applications <strong>for</strong> resource<br />
<strong>consents</strong> to include an assessment of the actual or potential effects that the proposed<br />
activity may have on the environment and the ways in which any adverse effects can be<br />
mitigated. The Fourth Schedule of the Act lists the matters that should be included in such<br />
assessments and a summary is printed on the back of the application <strong>for</strong>m.<br />
You must fully complete this section or your application cannot be processed.<br />
The in<strong>for</strong>mation you supply should be detailed according to the scale, scope and effects of<br />
the proposed activity.<br />
Applicants <strong>for</strong> small scale proposals having minor effects should be able to supply sufficient<br />
in<strong>for</strong>mation by filling in the spaces provided. More complex proposals with more significant<br />
effects will need to address the following matters (in accordance with the Fourth Schedule)<br />
as a separate document.<br />
If the AEE is presented in the <strong>for</strong>mat of a report, it must address the following matters, if<br />
appropriate.<br />
If you are unsure how to complete this section please contact an environmental <strong>consents</strong><br />
officer at Environment Bay of Plenty.<br />
Part A: To dam <strong>water</strong><br />
Part B: To divert <strong>water</strong><br />
Part B — To Divert Water<br />
1 Is the diversion:<br />
existing<br />
or proposed?<br />
If the diversion relates to a new activity a land use consent may also be required.<br />
If the diversion is in the coastal marine area a coastal permit to divert <strong>water</strong> is required. You can<br />
make the application on this <strong>for</strong>m. A coastal permit to erect any structures and occupy the coastal<br />
marine area is required <strong>for</strong> a new diversion.<br />
2 Why are you diverting <strong>water</strong>?<br />
Status: Final Page 21 April 2009<br />
Project Number: 3932036<br />
NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE