NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

(b) Notwithstanding any rule to the contrary in the Plan, any activity that involves the removal,<br />

deposition, movement or disturbance in any 12- month period from within or adjacent to any Special<br />

Ecological Site of more than 10m³ earth/soil is a non-complying activity.<br />

(c) Notwithstanding any rule to the contrary in the Plan, any activity that involves the removal or loss in<br />

any 12-month period from within or adjacent to any Special Ecological Site of more than 20m² of<br />

indigenous vegetation is a non-complying activity.<br />

Chapter 24: Transportation Activity and Other Network Utility Rules<br />

Storm<strong>water</strong> detention ponds and associated <strong>earthworks</strong> and structures under Table 24-1 in the Industrial<br />

Business Zone are controlled activities. The matters council reserves its control over include:<br />

24.3.<strong>2.</strong>1<br />

(a) District-wide rules contained within the Plan (see Chapters 11 to 18)<br />

(b) Imposition of financial contributions in accordance with Chapter 26 Financial Contribution Rules<br />

(c) Imposition of conditions in accordance with Section 108 of the Resource Management Act 1991.<br />

Table 4: District Consents Required<br />

Storm<strong>water</strong> Treatment Wetland<br />

Consent Required Status Activity<br />

District Consents Required<br />

Land Use - Network<br />

Utility Rules<br />

Earthworks<br />

Vegetation Clearance<br />

Controlled<br />

Non<br />

Complying<br />

Non<br />

Complying<br />

Storm<strong>water</strong> detention ponds and<br />

associated <strong>earthworks</strong> and<br />

structures under Table 24-1 in the<br />

Industrial Business Zone are<br />

controlled activities<br />

Construction of the Storm<strong>water</strong><br />

Wetland adjacent to an SES<br />

Vegetation removal <strong>for</strong> the<br />

Storm<strong>water</strong> Wetland adjacent to an<br />

SES<br />

Status: Final Page 42 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE