NZ Transport Agency and Tauranga City Council<br />
<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />
(b) Notwithstanding any rule to the contrary in the Plan, any activity that involves the removal,<br />
deposition, movement or disturbance in any 12- month period from within or adjacent to any Special<br />
Ecological Site of more than 10m³ earth/soil is a non-complying activity.<br />
(c) Notwithstanding any rule to the contrary in the Plan, any activity that involves the removal or loss in<br />
any 12-month period from within or adjacent to any Special Ecological Site of more than 20m² of<br />
indigenous vegetation is a non-complying activity.<br />
Chapter 24: Transportation Activity and Other Network Utility Rules<br />
Storm<strong>water</strong> detention ponds and associated <strong>earthworks</strong> and structures under Table 24-1 in the Industrial<br />
Business Zone are controlled activities. The matters council reserves its control over include:<br />
24.3.<strong>2.</strong>1<br />
(a) District-wide rules contained within the Plan (see Chapters 11 to 18)<br />
(b) Imposition of financial contributions in accordance with Chapter 26 Financial Contribution Rules<br />
(c) Imposition of conditions in accordance with Section 108 of the Resource Management Act 1991.<br />
Table 4: District Consents Required<br />
Storm<strong>water</strong> Treatment Wetland<br />
Consent Required Status Activity<br />
District Consents Required<br />
Land Use - Network<br />
Utility Rules<br />
Earthworks<br />
Vegetation Clearance<br />
Controlled<br />
Non<br />
Complying<br />
Non<br />
Complying<br />
Storm<strong>water</strong> detention ponds and<br />
associated <strong>earthworks</strong> and<br />
structures under Table 24-1 in the<br />
Industrial Business Zone are<br />
controlled activities<br />
Construction of the Storm<strong>water</strong><br />
Wetland adjacent to an SES<br />
Vegetation removal <strong>for</strong> the<br />
Storm<strong>water</strong> Wetland adjacent to an<br />
SES<br />
Status: Final Page 42 April 2009<br />
Project Number: 3932036<br />
NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE