NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

Overall the total volume of <strong>earthworks</strong> required <strong>for</strong> the <strong>storm</strong><strong>water</strong> treatment wetland is approximately<br />

45,400m 3 .<br />

In the future design of the wetland and staging of the works required the following principles have been<br />

agreed by TCC, NZTA and MPBI achieve an acceptable <strong>storm</strong><strong>water</strong> treatment area:<br />

1. Maximise the use of the current lease area<br />

<strong>2.</strong> Retain as much of the established trees and plants as possible<br />

3. Not to encroach on the Special Ecological Site 13 located on the south of the treatment area<br />

4. Be capable receiving and treat <strong>storm</strong><strong>water</strong> from TCC’s residential areas, MPBI proposed industrial land<br />

and the TEM<br />

5. Not to encroach on the existing and proposed TCC pipeline easements along the western boundary<br />

6. Apply ARC TP10 design standards <strong>for</strong> the upgrading of the wetland.<br />

The following Table shows the <strong>storm</strong><strong>water</strong> runoff <strong>for</strong> the <strong>water</strong> quality <strong>storm</strong> events and the percentage split<br />

between the various parties.<br />

Table 11: Storm<strong>water</strong> Treatment Requirement<br />

Party<br />

Pervious area<br />

(km 2 )<br />

Impervious area<br />

(km 2 )<br />

Catchment area<br />

(km 2 )<br />

Volume required<br />

(m 3 )<br />

TCC<br />

0.79 1.75 <strong>2.</strong>54 12,941<br />

(Maranui and Arataki)<br />

MPBI<br />

0.01 0.45 0.46 11,635<br />

(Industrial)<br />

TEM<br />

0.04 0.15 0.19 3,247<br />

(Motorway)<br />

Total 0.84 <strong>2.</strong>35 3.19 27,823<br />

The current available leased area is too small <strong>for</strong> the <strong>storm</strong><strong>water</strong> treatment required <strong>for</strong> all developed land<br />

scenarios as shown above. There is a potential 5 ha low lying area available east of the current pond area,<br />

enclosed between MPBI southern boundary and the Special Ecological Site. The additional treatment area<br />

extends into that land and is shown in the technical report attached as Appendix 10. The report shows the<br />

layout and cross-section drawings <strong>for</strong> the extended treatment area.<br />

Status: Final Page 72 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!