NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

The meetings were held on:<br />

• 15 Feb 2008 – TEM Overview.<br />

• 8 July 2008 – TEM Interchange.<br />

• 21 Aug 2008 Workshop – TEM and TCC <strong>storm</strong><strong>water</strong> application.<br />

• 9 Sep 2008 – <strong>Mangatawa</strong> drain and possible mitigation measures.<br />

• 18 Dec 2008 - TEM and TCC <strong>storm</strong><strong>water</strong> application.<br />

• 29 Jan 2009 – TEM + TCC Storm<strong>water</strong> and roading issues.<br />

A summary of issues raised at these meetings relevant to this proposal are outlined below.<br />

Table 12: Summary of Issues Raised<br />

Issues raised<br />

Possible flow path <strong>for</strong> flood <strong>water</strong>s west through<br />

TCC Land.<br />

Protection of the future develop-ability of MPBI<br />

land.<br />

Construction of an Earth Bund along <strong>Mangatawa</strong><br />

Drain to protect building plat<strong>for</strong>ms.<br />

Concern <strong>for</strong> potential removal of whitebait habitat<br />

and eel holes. Riparian enhancement of lower<br />

<strong>Mangatawa</strong> Drain after works are completed to<br />

retain whitebait and eel habitat.<br />

Requested the extension of the Maranui swale<br />

outlet pipe to wetland to increase developable area.<br />

Drain maintenance.<br />

Existing <strong>storm</strong><strong>water</strong> treatment pond designed as a<br />

wetland to protect <strong>water</strong> quality of harbour.<br />

Accommodation of MPBI <strong>storm</strong><strong>water</strong> from future<br />

industrial land in wetland design.<br />

Connection of Truman lane <strong>storm</strong><strong>water</strong> to<br />

treatment wetland.<br />

Response<br />

Discounted by options selection process as<br />

technically difficult and costly<br />

Provision of the bund next to the <strong>Mangatawa</strong> Drain<br />

and the extension of the culvert from the Maranui<br />

Swale to the wetland.<br />

Included in the over all design concept and will be<br />

part of the construction of the TEM.<br />

Included in the over all design concept and will be<br />

part of the construction of the TEM.<br />

Included in the over all design concept. However<br />

not planned as part of the construction of the TEM.<br />

TCC to undertake maintenance<br />

Included in the over all design concept. However<br />

only the TEM component will be part of the<br />

construction of the TEM.<br />

Included in the over all design concept. However<br />

not planned as part of the construction of the TEM.<br />

Included in the over all design concept. However<br />

not planned as part of the construction of the TEM.<br />

Status: Final Page 77 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE