NZ Transport Agency and Tauranga City Council<br />
<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />
4. Activity Status<br />
This project is complex and seeks to address issues related to flooding and <strong>storm</strong><strong>water</strong> in the<br />
Papamoa/<strong>Mangatawa</strong> area. As such, to assign responsibility <strong>for</strong> each activity that is required by this proposal<br />
we have outlined the <strong>consents</strong> required as part of this project and the agency responsible <strong>for</strong> that consent.<br />
The duration shown in the table refers to the suggested duration of the consent and reflects the temporary<br />
predominantly construction related activities versus the long term operational activities.<br />
The <strong>consents</strong> required are shown in the Table 1 and <strong>for</strong> the purposes of this application the table describes the<br />
activities to be undertaken generally from East to West as the <strong>catchment</strong> flows.<br />
4.1 Regional Water and Land Plan<br />
The <strong>consents</strong> required under the operative Regional Water and Land Plan are shown in the table below.<br />
Table 1: Regional Consents required and ownership status of each consent<br />
NOTE: All plan references made in this table refer to Plan 3932036-CK301 Rev C attached as Appendix 1.<br />
<strong>Mangatawa</strong> Flood Bypass and TEM Storm<strong>water</strong><br />
Consent Required Status Activity Plan<br />
Ref<br />
Proposed<br />
Consent Holder<br />
10yrs<br />
35yrs<br />
Regional Consents Required<br />
Land and Soil Disturbance Activities – Rule 1C, Form 2<br />
Earthworks Discretionary Construction of an earth bund @<br />
Top Spill & Barrier @ Bruce Road<br />
2,4, NZTA<br />
Land and soil<br />
disturbance by<br />
vegetation clearing<br />
Restricted<br />
Discretionary<br />
<strong>Mangatawa</strong> Drain works -<br />
Vegetation Clearance<br />
3 NZTA<br />
Earthworks Discretionary <strong>Mangatawa</strong> Drain works –<br />
Installation of flood protection<br />
structures at Rail Bridge<br />
Earthworks Discretionary <strong>Mangatawa</strong> Drain works - Flood<br />
storage east of Kairua Road<br />
Earthworks Discretionary Drain widening between Bruce<br />
Road and Maranui Swale <strong>for</strong> flood<br />
protection.<br />
5, 6 NZTA<br />
1 NZTA<br />
NZTA<br />
Earthworks Discretionary <strong>Mangatawa</strong> Drain works - 10 NZTA<br />
Status: Final Page 38 April 2009<br />
Project Number: 3932036<br />
NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE