32 Harington Street<br />

PO Box 903, Tauranga 3140, New Zealand<br />

T: +64 7 578 0896 // F: +64 7 578 2968<br />

E: info@beca.com // www.beca.com<br />

Environment Bay of Plenty<br />

PO Box 364<br />

Whakatane<br />

New Zealand<br />

19 June 2009<br />

Attention: Dudley Clemens<br />

Dear Dudley<br />

<strong>Mangatawa</strong> Storm<strong>water</strong> Joint Application No. 65435<br />

Please find enclosed a Cultural Impact Assessment (CIA) requested by the landowner, <strong>Mangatawa</strong><br />

Papamoa Blocks Incorporated (MPBI), who has the land adjacent to the lower <strong>Mangatawa</strong> drain<br />

leading to the harbour. This in<strong>for</strong>mation is supplementary to the consultation record in the main<br />

application and is relevant <strong>for</strong> this landowner only.<br />

The assessment identified a waahi tapu area near the lower <strong>Mangatawa</strong> drain works and has<br />

resulted in the kaumatua of Nga Potiki undertaking to determine the extent of the site. The issue<br />

identified in the CIA did not relate to the flooding of the land but was associated with movement and<br />

excavation of soil in this area (see assessment <strong>for</strong> details).<br />

A summary of the main works required along the lower <strong>Mangatawa</strong> drain include:<br />

• Redistribution of existing drain spoil, piled next to the existing drain. Appendix 10 of the<br />

main application shows the cross sectional details (Drawing 3932036 ck469 Rev A) of the<br />

proposed works.<br />

• Filling of adjacent industrial zoned land to give flood protection to the land <strong>for</strong> future<br />

develop-ability and re-contouring the lower <strong>Mangatawa</strong> drain riparian margin<br />

• Re-vegetation and landscaping of the re-contoured lower <strong>Mangatawa</strong> drain margin <strong>for</strong><br />

recreational purposes.<br />

In general terms, the CIA does not oppose these activities, however in relation to the extent of the<br />

waahi tapu site and the works required on or near it, these industrial protection works may be<br />

required to be moved westwards to avoid the extent of the waahi tapu site and accommodate the<br />

hapu’s wishes.<br />

NZTA is facilitating this process through consultation with MPBI.<br />

Yours faithfully<br />

Christine Ralph<br />

Technical Director - Planning<br />

on behalf of<br />

Beca Infrastructure Ltd<br />

Direct Dial: +64-7-577 1129<br />

Email: christine.ralph@beca.com<br />

Copy<br />

Michael Parsonsen<br />

Our Ref: 3932036<br />

NZ1-1842494-6 0.6