01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

• Has less effect on Special Ecological Site 13.<br />

• Lower cost overall.<br />

• Can be integrated with the MPBI development and aesthetics and use of the area and over all uses less land<br />

than other options.<br />

• Appears to fit within the riparian area shown on the MPBI development concept, so no change to the<br />

usable area of the development.<br />

The aspects where the <strong>Mangatawa</strong> flood bypass has less merit are:<br />

• Additional space is required along lower <strong>Mangatawa</strong> drain <strong>for</strong> the flood bypass. However less is required<br />

along the Maranui flood bypass.<br />

Drawings showing these works in detail are attached 3932036-ck143 to 3932036 ck146 (also Appendix 9).<br />

The <strong>Mangatawa</strong> flood bypass (Option 4) is considered to be the preferred option.<br />

Status: Final Page 66 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!