134 REPORT OF THE INSPECTORS OF MINES. Off. Doc.<br />

T^\o "Green Kidge slate pickers" have beeu put iu Jeddo No. 4<br />

breaker for cleaning stove coal and an auxiliary slate drag line has<br />

beeu added.<br />

Ebervale.—Carpenter and blacksmith shops have been built, also a<br />

wash house for <strong>the</strong> accommodation <strong>of</strong> miners.<br />

A stripping known as "Stripping ()," has been opened on <strong>the</strong> Mamjiioth<br />

vein on <strong>the</strong> north side <strong>of</strong> <strong>the</strong> property, and it is now being<br />

stripped to <strong>the</strong> west.<br />

The South Side drainage canal which ended with <strong>the</strong> west end<br />

<strong>of</strong> <strong>the</strong> Jeddo property line is now being extended along <strong>the</strong> south<br />

<strong>of</strong> Ebervale to connect with <strong>the</strong> south side drainage canal on <strong>the</strong><br />

Harleigh property.<br />

First Lift gangway, north side, has been opened from No. 1 slope<br />

to west end <strong>of</strong> property.<br />

A GO ton Bucjrus shovel and two G-wheel 25 ton Baldwin locomotives<br />

have been added to <strong>the</strong> stripping plant.<br />

Jeddo.—A reservoir <strong>of</strong> about 2, 5()(), ()()() gallons capacity at Jeddo<br />

South Side water works was completed in June.<br />

A Kand Drill Co. air compressor and air pump connected with<br />

<strong>the</strong> G inch bore hole reported in 189G liave been installed and an additional<br />

boiler added to <strong>the</strong> boiler plant at this place.<br />

A six inch pipe line was laid from <strong>the</strong> north side <strong>of</strong> East End<br />

stripping to <strong>the</strong> new pumping station at Jeddo.<br />

A twin pumping plant for pumping water to all collieries on <strong>the</strong><br />

Jeddo property has been erected, consisting <strong>of</strong> two 100 horse pow'er<br />

economic boilers and two compound pumps <strong>of</strong> <strong>the</strong> Jeanesville Iron<br />

Works pattern, and a new pump and boiler house has been erected<br />

and necessary pipes laid to lead to mains for supply.<br />

Tlic Old Slope pumping station has been abandoned.<br />

Upper Lehigh Coal Company.<br />

A new locomotive was purchased to handle <strong>the</strong> increased tonnage<br />

from <strong>the</strong> several strippings.<br />

At No. 2 boiler plant a 6 foot Sturtevant blower fan was installed<br />

which is o])orated by a 12x12 inch horizontal engine.<br />

Although <strong>the</strong> coal is washed, <strong>the</strong>re is at times considerable dust<br />

generated about <strong>the</strong> steamboat screen, and to obviate this as far as<br />

])Ossible. an air stack has boon placed through <strong>the</strong> ro<strong>of</strong> <strong>of</strong> <strong>the</strong> breaker<br />

to <strong>the</strong> rolls.<br />

At <strong>the</strong> oast«M'n end <strong>of</strong> <strong>the</strong> property an 8 inch artesian well was sunk<br />

534 fe«'t and a lOxHx.'i inch lifting pump put down .315 feet.<br />

In No. 2 Slo])e a rock tunnel has been driven 210 feet to connect<br />

wWh X(». 1 slope for <strong>the</strong> ])urpose <strong>of</strong> drainage; this relieves <strong>the</strong> pum]>s<br />

in No. 1 at present and will eventually do away with <strong>the</strong>m entirely.