12.07.2015 Views

Travel Demand Model - OKI

Travel Demand Model - OKI

Travel Demand Model - OKI

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>OKI</strong>/MVRPC <strong>Travel</strong> <strong>Demand</strong> <strong>Model</strong> – Version 6.05. Transit Network SkimmingThe procedures for building transit paths and calculating walk, in-vehicle, transfer and wait timesfor all transit modes were significantly overhauled as part of the Version 6.0 model developmenteffort. The new path building procedures are consistent with the nested structure adopted forthe consolidated mode choice model (see Figure 5-1). In addition, the procedure for estimatingzonal fares was updated to reflect the zone system of the consolidated region.Figure 5-1 Consolidated <strong>Model</strong> Mode Choice StructureChoiceAutoTransitDrive Alone Shared Ride Local Express Urban CommuterBus Bus Rail Rail2-Person 3+ Person Walk Park Kiss Walk Park Kiss Walk Park Kiss Walk Park KissAuto Auto Ride Ride Ride Ride Ride Ride RideRideHOV NonHOVHOV NonHOV5.1 Transit Path BuildingThe path building routine constructs eight sets of transit paths, two per transit mode, and foreach transit mode one per access mode, resulting in the following sets: local bus (walk access,drive access), express bus (walk access, drive access), light rail (walk access, drive access), andcommuter rail (walk access, drive access). Light and commuter rail are not valid transit modes inthe base year (1995), but they are included for testing alternative transit scenarios. In the eventthat these modes were available, it is expected that the local bus system will feed trips into therail system. Thus transit paths for which express bus, light rail or commuter rail is the maintransit mode are allowed to transfer to/from the local bus system. The parameters used toweight wait, walk, run and transfer times are listed in Table 5-1. Please see Appendix D for acopy of the path building Tranplan control files.Zones and Networks / 5 - Transit Network Skimming19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!