12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 6Fiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1029 I 90 8580-149AC2 MN/DOT **BP08** DRESBACH BRIDGE - INCLUDES $14.3M SBPF 0.0 BR BRIDGEIM 14,300,000 14,300,000 00 0 0(20%) - (AC PAYBACK 2 OF 2)REPLACEMENT1030 TH 247 5512-08AC MN/DOT BITUMINOUS MILL & OVERLAY FROM JCT. T.H. 63 TO JCT. 12.6 RS MILL ANDSTP 2,400,000 2,400,000 00 0 0T.H. 42 (AC PAYBACK 1 OF 1)OVERLAY1031 TH 999 8826-109 MN/DOT **ADA** FUNDS - PEDESTRIAN RAMPS - VARIOUS0.0 SC PED./BIKESTP 287,500 230,000 00 57,500 0LOCATIONS DISTRICTWIDE - 2014IMPROVEMENT1032 TH 999 8806-LT-14S MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 20140.0 SH LIGHTINGHSIP 50,000 45,000 00 5,000 01033 MN 999 8806-RW-14 MN/DOT DISTRICTWIDE SETASIDES - R/W - 20140.0 RW RIGHT OF WAY SF 8,664,000 0 00 8,664,000 01034 MN 999 8806-SAS-14 MNDOT DISTRICTWIDE SETASIDES - 20140.0 NA MISCELLANEOUS STP 19,824,000 3,566,410 00 16,257,590 01035 LOCAL 999 8806-SHL-14 LOCAL HSIP/HRRR SETASIDE - LOCAL - 20140.0 SH SAFETY TARGET HSIP 1,588,236 1,429,412 00 0 <strong>15</strong>8,8241036 MN 999 8806-SHS-14 MN/DOT HSIP/HRRR SETASIDE - MN/DOT 20140.0 SH SAFETY TARGET HSIP 640,000 576,000 00 64,000 0$116,835,672 $60,025,204 $28,130,000 $5,097,009 $33,187,490 $18,525,969September 2011Project Listing Page III - 80 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!