12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: ST CLOUD AREA PLANNING ORGANIZATIONFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other452 I 94 7380-222 MNDOT 0.7 MI. E. OF ALBANY TO END OF EB ENTRANCE RAMP AT 7.9 RS MILL AND IM 5,339,994 4,805,995 00 533,999 0STEARNS CO CR <strong>15</strong>9 AT COLLEGEVILLE (EB & WB), MILL &OVERLAYOVERLAY, PAVE SHOULDERS460 MN 301 7109-06 MNDOT **BR4M** TH 10 TO JCT. CSAH 8 IN ST. CLOUD, MN STATE 1.1 RS MILL & OVERLAY STP 265,000 212,000 00 53,000 0REFORMATORY, MILL & OVERLAY464 MN 999 8823-145 MNDOT DISTRICTWIDE INTERSECTION LIGHTING AT VARIOUS 0.0 SH LIGHTING HSIP 466,667 420,000 00 46,667 0TRUNK HIGHWAY/TRUNK HIGHWAY INTERSECTIONS (HSIPPROJECT)465 MN 999 8823-148 MNDOT DISTRICTWIDE RUMBLESTRIPS/SIGNING/MARKINGS 0.0 SH RUMBLE STRIPS HSIP 237,777 213,999 00 23,778 0PROJECT (HSIP PROJECT)466 MN 999 8823-250 MNDOT DISTRICTWIDE SIGNAL COORDINATION PROJECT (HSIP 0.0 SH TRAFFIC SIGNAL HSIP 290,000 261,000 00 29,000 0PROJECT)REVISION467 MN 999 8803-RW-12 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - <strong>2012</strong> 0.0 RW RIGHT OF WAY SF 4,500,000 0 00 4,500,000 0468 MN 999 8803-SAS-12 MNDOT DISTRICTWIDE SETASIDES - <strong>2012</strong>0.0 NA MISCELLANEOUS SF 13,030,000 0 00 13,030,000 0469 LOCAL 999 8803-SHL-12 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY0.0 SH SAFETY TARGET HSIP 28,664 25,798 00 0 2,866IMPROVEMENT PROGRAM - <strong>2012</strong>$82,653,522 $27,308,773 $1,130,137 $5,268,662 $23,764,926 $26,311,161September 2011MPO Project Listing A-1 Page 13 of 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!