12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1668 MN 62 2774-21 MN/DOT **BR4M**FROM TRACY AVE IN EDINA TO UNDER PENN 3.1 RS MILL ANDSF 4,500,000 0 00 4,500,000 0AVE BRIDGE IN RICHFIELD/MINNEAPOLIS-MEDIUMOVERLAYMILL&OVERLAY (ASSOCIATED TO NON-PRIME SP 2763-48)1669 MN 65 0207-93 MN/DOT 50TH AVE IN COLUMBIA HEIGHTS-REPLACE TRAFFIC 0.0 SC TRAFFIC SIGNAL SF LF 250,000 0 00 125,000 125,000SIGNALREVISION1670 MN 65 0207-94 MN/DOT FROM I-694 IN FRIDLEY TO ANOKA CSAH 24 (237TH AVENE) IN EAST BETHEL-CABINET UPGRADES, SIGNALTIMING, DEPLOYMENT OF CCTV CAMERAS, & VARIABLEMESSAGE SIGNS23.1 TM TRAFFIC MGMT.SYSTEMCMAQ 1,400,000 1,120,000 00 280,000 01671 MN 65 0207-95 MN/DOT WASHINGTON AVE IN MPLS TO 53RD AVE N IN COLUMBIAHTS(NOT INCLUDING 27TH TO 37TH AVE EXCEPT APROFILE CORRECTION AT THE RR CROSSING, 14TH TO18TH AVE AND BRIDGE 2440)-MILL & OVERLAY, DRAINAGE& GUARDRAIL REPAIRS7.0 RS MILL ANDOVERLAYSF 3,860,000 0 00 3,860,000 01672 MN 65 0207-101 MN/DOT **BR4M**FROM 40TH AVE IN COLUMBIA HTS TO I694 IN 2.2 RS TRAFFIC SIGNAL SF 700,000 0 00 700,000 0FRIDLEY-ATM IMPROVEMENTSREVISION1673 MN 65 0208-127 MNDOT E SIDE OF TH 65, <strong>15</strong>3RD AVE TO <strong>15</strong>9TH AVE, HAM LAKE- 0.8 AM GRADE AND SF 1,300,000 0 00 1,300,000 0ACCESS CLOSURES AND CONSTRUCT FRONTAGE RDSSURFACE($1.3M OF ACCESS MANAGEMENT FUNDS)1674 MN 65 0208-132 MN/DOT 169TH AVE NE, HAM LAKE-CONVERT INTERSECTION TO A 0.8 SH GRADE AND HSIP 1,035,000 931,500 00 103,500 0DIRECTIONAL CROSSOVER WITH MEDIAN U-TURNSSURFACE1675 MN 65 0208-140 MNDOT 0.7 MI S OF ANOKA CSAH 14 TO 1.3 MI N OF ANOKA CSAH 2.2 RB LANDSCAPING SF 125,000 0 00 125,000 014, BLAINE - LANDSCAPING1676 MN 65 0208-145 MN/DOT AT ANOKA CSAH 116 IN HAM LAKE - CONSTRUCT TWO NB 0.4 AM GRADE AND SF 500,400 0 00 500,400 0LEFT TURN LANES, EXTEND SB LEFT TURN LANE, ANDSURFACESIGNAL REVISIONS1677 MN 65 0208-146 MN/DOT **BR4M**FROM N OF 217TH AVE TO ANOKA/ISANTI COLINE IN EAST BETHEL-UNBONDED CONCRETE OVERLAY,DRAINAGE REPAIR, ADA IMPROVEMENTS, TURN LANES($300K IN OTHER ARE DPS FUNDS)3.5 RC UNBONDEDCONCRETEOVERLAYNHS DPS 10,031,000 7,080,500 00 550,500 2,400,0001678 MN 77 1925-53 MN/DOT **BR4M**FROM 138TH S IN APPLE VALLEY TO SOUTH OF 4.2 RS CONCRETE SF 5,800,000 0 00 5,800,000 0MN13 IN EAGAN - MINOR CONCRETE PAVEMENT REHAB,PAVEMENTADA AND GUARDRAIL UPGRADESREHAB1679 MN 77 1925-54 MN/DOT **BR4M**FROM SOUTH OF MN13 TO S END OF MINN1.0 RS MILL ANDSF 1,730,000 0 00 1,730,000 0RIVER BRIDGE (DAKOTA/HENNEPIN CO LINE) IN EAGAN-OVERLAYMILL&OVERLAY, ADA AND GUARDRAIL UPGRADES1680 I 94 6282-193 MN/DOT JOHN IRELAND BLVD, ST PAUL TO I-694/I-494 IN7.7 SC SIGNINGSF 500,000 0 00 500,000 0WOODBURY-REPLACE SIGNINGSeptember 2011Project Listing Page III - 126 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!