12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AERONAUTICSATP: 4Fiscal Year: <strong>2012</strong>AirportDescription<strong>STIP</strong> for FY <strong>2012</strong> - 20<strong>15</strong>Total Project Cost FAA Funding State Funding Municipal FundingALEXANDRIA MUNICIPAL AIRPORT - CHANDLER FIELD SRE 1-TON TRUCK WITH PLOW 45,000 0 30,002 14,999ALEXANDRIA MUNICIPAL AIRPORT - CHANDLER FIELD FUEL FARM UPDATE 10,000 0 5,000 5,000APPLETON MUNICIPAL AIRPORT BITUMINOUS OVERLAY 250,000 0 200,000 50,000BENSON MUNICIPAL AIRPORT - VETERANS FIELD 4 UNIT T-HANGAR 300,000 285,000 0 <strong>15</strong>,000BENSON MUNICIPAL AIRPORT - VETERANS FIELD SNOW REMOVAL EQUIPMENT 200,000 190,000 0 10,000BENSON MUNICIPAL AIRPORT - VETERANS FIELDARRIVAL/DEPARTURE BUILDINGIMPROVEMENTS - ROOF REPAIR25,000 0 17,500 7,500BENSON MUNICIPAL AIRPORT - VETERANS FIELD ENTRANCE ROAD - CRACK SEAL AND SEAL COAT 20,000 0 14,000 6,000BENSON MUNICIPAL AIRPORT - VETERANS FIELD SEPTIC SYSTEM IMPROVEMENTS 50,000 0 35,000 <strong>15</strong>,000DETROIT LAKES MUNICIPAL AIRPORT - WETHING FIELD OVERLAY RUNWAY 13/31 3<strong>15</strong>,000 299,250 0 <strong>15</strong>,750DETROIT LAKES MUNICIPAL AIRPORT - WETHING FIELD EXPAND PARKING LOT 10,500 0 7,350 3,<strong>15</strong>0DETROIT LAKES MUNICIPAL AIRPORT - WETHING FIELD BAY HANGAR (LOCAL PORTION) 66,000 0 0 66,000DETROIT LAKES MUNICIPAL AIRPORT - WETHING FIELD EXTEND RWY 13/31 - LAND 384,072 364,868 0 19,204DETROIT LAKES MUNICIPAL AIRPORT - WETHING FIELD BAY HANGAR [HANGAR LOAN] 264,000 0 264,000 0ELBOW LAKE MUNICIPAL AIRPORT-PRIDE OF THEPRAIRIEFERGUS FALLS MUNICIPAL AIRPORT-EINARMICKELSON FLDFERGUS FALLS MUNICIPAL AIRPORT-EINARMICKELSON FLDFERGUS FALLS MUNICIPAL AIRPORT-EINARMICKELSON FLDEXPAND AIRCRAFT PARKING APRON 350,000 332,500 0 17,500DESIGN ENGINEERING FOR A MULTI-UNIT T-HANGAR30,000 28,500 0 1,500MULTI UNIT TEE HANGAR CONSTRUCTION 500,000 475,000 0 25,000HANGAR SITE PREPARATION AND PAVING 300,000 240,000 30,000 30,000GLENWOOD MUNICIPAL AIRPORT CRACK REPAIR & SEAL COATING 65,000 61,750 0 3,250GLENWOOD MUNICIPAL AIRPORT SRE - LOADER, PLOW, BLOWER, BUCKET, BROOM 380,205 361,195 0 19,010HAWLEY MUNICIPAL AIRPORTHAWLEY MUNICIPAL AIRPORTAPRON REHABILITATION (NON FAA ELIGIBLE)HANGAR #1APRON REHABILITATION - HANGAR #1 (FAAELIGIBLE AREAS)40,000 0 20,000 20,000102,000 96,900 0 5,100HENNING MUNICIPAL AIRPORT SNOW REMOVAL EQUIPMENT <strong>15</strong>,000 0 12,000 3,000MAHNOMEN COUNTY AIRPORT EXPAND APRON S (350' X 200') 250,000 237,500 0 12,500September 2011 Office of Aeronautics, Airport Development and Assistance Section Aeronautics Project Listing Appendix B-3 Page 27 of 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!