12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Enhancement ProjectsFiscal Year: <strong>2012</strong>Seq #RouteSystem Project Number Agency Description Miles Program ProposedATPType of WorkFundsTotal<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>FHWA AC FTA State Other<strong>15</strong>63 M EN 091-070-0<strong>15</strong> ST PAUL INTERPRETIVE SITE OF PEDESTRIAN BR L-5853 0.0 EN ENHANCEMENT TEA 1,214,080 719,488 00 0 494,592PARK/REC OVER FORMER COMO/HARRIET STREETCAR LINE,COMO PARK<strong>15</strong>64 M PED/BIKE 091-090-047 DAKOTA COUNTY PINE BEND BLUFFS TRAILHEAD TO 117TH ST, INVER 1.5 EN PEDESTRIAN TEA 1,500,000 943,312 00 0 556,688GROVE HTS-CONSTRUCT MISS RIVER REGIONALBIKE TRAILPED/BIKE TRAIL<strong>15</strong>66 M PED/BIKE 091-090-056 SAINT PAUL CHEROKEE REGIONAL PARK-CONSTRUCT PED/BIKE 1.3 EN PEDESTRIAN TEA 2,640,000 1,090,000 00 0 1,550,000PARKS & REC TRAIL, OVERLOOKS, ETC ALONG S BLUFF OF MISSBIKE TRAILRIVER<strong>15</strong>67 M PED/BIKE 091-090-057 DAKOTA COUNTY MISS RIVER REG TR, SCHARRS BLUFF TO MISS 1.6 EN PED./BIKETEA 1,290,240 1,032,192 00 0 258,048RIVER, SPRING LK RARK RESERVE, NININGER TWP-IMPROVEMENTCONSTRUCT PED/BIKE TR & TRAILHEAD FACILITY<strong>15</strong>68 M PED/BIKE 091-090-058 DAKOTA COUNTY TH 110 TO GARLOUGH ELEMENTARY, WEST ST 1.1 EN PEDESTRIAN TEA 992,600 794,080 00 0 198,520PAUL-CONSTRUCT N URBAN REG TR INCLUDINGBIKE TRAILUNDERPASS<strong>15</strong>69 M PED/BIKE 091-090-059 DAKOTA COUNTY MISS RIVER REG TR, 117TH ST TO SPRING LK REG 3.7 EN PEDESTRIAN TEA 2,500,000 1,090,000 00 0 1,410,000PARK, ROSEMOUNT-CONSTRUCT PED/BIKE TRAILBIKE TRAIL<strong>15</strong>70 M PED/BIKE 091-090-060 RAMSEY COUNTY ALONG LOWER AFTON RD, MCKNIGHT RD TO PT 1.0 EN PEDESTRIAN TEA 981,000 784,800 00 0 196,200PARKS DOUGLAS RD, ST PAUL-CONSTRUCT PAVEDBIKE TRAILPED/BIKE TRAIL<strong>15</strong>74 M PED/BIKE 107-090-005 BLOOMINGTON LONG MEADOW LAKE, BLOOMINGTON-REPLACE BR 0.0 EN PED./BIKETEA 3,210,000 1,070,000 00 0 2,140,0003145 ON OLD CEDAR AVE WITH A PED/BIKEIMPROVEMENTBOARDWALK<strong>15</strong>75 M PED/BIKE 107-090-006 BLOOMINGTON 20TH AVE TO 22ND AVE, BLOOMINGTON-0.0 EN PEDESTRIAN TEA 1,980,000 1,008,000 00 0 972,000CONSTRUCT PED/BIKE BRIDGE OVER KILLEBREWBIKE BRIDGEDR SO OF MALL OF AMERICA<strong>15</strong>76 M PED/BIKE 120-020-037 EDINA LYNMAR LANE TO E OF FRANCE AVE NEAR 72ND ST 0.1 EN PED./BIKETEA 2,180,000 1,090,000 00 0 1,090,000S, EDINA-CONSTRUCT PED/BIKE BRIDGE OVERIMPROVEMENTFRANCE AVE<strong>15</strong>78 M EN 141-080-042 MINNEAPOLIS HENN AVE TO CEDAR AVE, MPLS-0.0 EN BRIDGE REPAIR TEA 1,400,000 1,120,000 00 0 280,000REHABILITATE/PRESERVE HISTORIC BRS WHICHOTHERARE OVER MIDTOWN GREENWAY<strong>15</strong>93 M PED/BIKE 164-020-109 SAINT PAUL RAYMOND AVE, UNIVERSITY AVE TO HAMPDEN ST,ST PAUL-RECONSTRUCT RAYMOND AVE,INCLUDING GRADING AND SURFACING,INTERSECTION REALIGNMENT, AND PEDESTRIANSTREETSCAPE IMPROVEMENTS0.4 EN PED./BIKEIMPROVEMENTTEA 1,612,800 1,075,200 00 0 537,600September 2011Enhancement Project Listing A-2 Page 4 of 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!