12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 3Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other420 CR 134 073-596-006AC1 STEARNS COUNTY GRADING, AGG BASE, BITUMINOUS SURFACING, CURB &GUTTER, DRAINAGE, SIGNING & STRIPING, BR #73571 &APPURTENANT WORK ON STEARNS CR 134 FROMSTEARNS CSAH 4 TO 350 FT. S OF WEST OAKS DR & ONSTEARNS CR 134 FROM DRIFTWOOD RD TO RILLA RD (ACPAYBACK, 1 OF 2)0.5 MC GRADE,SURFACE &STP 2,485,104 2,485,104 00 0 0421 CSAH 120 073-720-002 STEARNS COUNTY SAFETY IMPROVEMENTS FROM 500 FEET WEST OF 50TH 0.5 SC MEDIAN BARRIER STP 500,000 0 1,000,0000 0 500,000AVENUE TO CONNECTICUT AVENUE IN SARTELL (ACPROJECT, PAYBACK IN 20<strong>15</strong>)422 LOCAL 999 077-070-004 TODD COUNTY INSTALL WET REFLECTIVE PAVEMENT MARKINGS AT 32.0 SH STRIPINGHSIP 272,000 244,800 00 0 27,200VARIOUS LOCATIONS IN TODD COUNTY423 LOCAL 999 077-596-002 STAPLES **TIGER II** CONSTRUCTION OF NORTH-SOUTH2.2 MC GRADE,FFM 7,600,000 6,125,600 00 0 1,474,400CORRIDOR WITH RAILROAD OVERPASS AND ROADWAYS,SURFACE &CITY OF STAPLES424 LOCAL 999 077-596-005 STAPLES **TIGER II** CONSTRUCTION ENGINEERING FOR NORTH- 0.0 PL PLANNINGFFM 608,000 608,000 00 0 0SOUTH CORRIDOR WITH RAILROAD OVERPASS ANDROADWAYS, CITY OF STAPLES425 LOCAL 999 080-070-002 WADENA COUNTY INSTALL LIGHTING, SIGNING AND PAVEMENT MARKINGS 0.0 SH MISCELLANEOUS HSIP 86,200 77,580 00 0 8,620AT VARIOUS LOCATIONS IN WADENA COUNTY426 LOCAL 999 086-070-005 WRIGHT COUNTY **MN 231** TOWNSHIP SIGNING, PHASE II CONSTRUCTION 0.0 SH SIGNINGHPP 1,390,000 1,112,000 00 0 278,000IN WRIGHT COUNTY427 LOCAL 999 086-070-006 WRIGHT COUNTY WRIGHT COUNTY, INSTALL CHEVRONS AT VARIOUS 77.9 SH SIGNINGHSIP 264,000 225,000 00 0 39,000LOCATIONS428 PED/BIKE 086-591-001 MONTROSE **SRTS IN** CONNECTING NEIGHBORHOODS IN W & S 0.0 BT PED./BIKESRTS 200,000 175,000 00 0 25,000MONTROSE TO ELEMENTARY SCHOOL & EXISTINGIMPROVEMENTSYSTEM OF SIDEWALKS & TRAILS (2008 SOLICITATION)429 PED/BIKE 092-090-036 MNDNR CONSTRUCT 2.4 MI OF GLACIAL LAKES TRAIL BETWEEN 2.4 EN PEDESTRIAN TEA 400,000 199,104 00 0 200,896RICHMOND & 178TH AVE W OF COLD SPRINGBIKE TRAIL430 PED/BIKE 092-090-037 MNDNR **MN 174** CONSTRUCT BIKE/PED EXTENSION TO PAUL 6.5 BT PEDESTRIAN HPP 855,0<strong>15</strong> 684,012 00 0 171,003BUNYAN TRAIL, MISSISSIPPI RIVER BRIDGE TRAIL TOBIKE TRAILCROW WING STATE PARK431 LOCAL 999 098-080-041 NISSWA LOCAL COST PARTICIPATION ON TH 371RECONSTRUCTION PROJECT (SP 1810-98) & CROW WINGCSAH 18 NEW ALIGNMENT PROJECT (SP 018-618-009)THROUGH CITY OF NISSWA (TRLF PROJECT)1.4 AM RIGHT OF WAY TRLF 1,035,000 0 00 0 1,035,000432 LOCAL 999 108-591-002 BRAINERD **SRTS ** CITY OF BAXTER -CONDUCT FEASIBILITY0.0 PL PLANNINGSRTS 10,000 10,000 00 0 0STUDY FOR A MULTI-USE TRAIL/SIDEWALK ON FAIRVIEWROADSeptember 2011Project Listing Page III - 35 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!