12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 6Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other883 TH 14 5501-35 MN/DOT HEAVY BIT. OVERLAY FROM CSAH 5 (BYRON) TO TH 52 16.1 RS BITUMINOUS NHS 1,100,000 0 4,400,0000 1,100,000 0(AC PROJECT, PAYBACK IN 2013)OVERLAY884 TH 16 2304-47 MN/DOT **ELLA** BITUMINOUS MILL & OVERLAY FROM S. JCT. T.H. 10.3 RS MILL ANDSTP 2,646,246 2,116,997 00 529,249 043 (RUSHFORD) TO 0.16 MI. W. OF W. HOUSTON CITYOVERLAYLIMITS - TIED WITH 2808-18885 TH 19 2503-30 MN/DOT BITUMINOUS RECLAMATION FROM 0.04 MI. E. ALMOND ST. <strong>15</strong>.6 RS BITUMINOUS STP 6,221,600 4,977,280 00 1,244,320 0(CANNON FALLS) TO T.H. 61RECLAMATION886 TH 30 7404-09 MN/DOT **BR4M** MEDIUM BITUMINOUS MILL AND OVERLAY FROM 7.6 RS MILL ANDSF 1,900,000 0 00 1,900,000 0T-130 X-ING TO N. JCT. T.H. 218OVERLAY887 I 35 6680-108 MN/DOT **BR4M** CONCRETE PAVEMENT REHABILITATION NB 5.7 RS CONCRETE SF 2,600,000 0 00 2,600,000 0AND SB FROM 0.1 MI. N. CSAH 9 TO HEATH CREEK RESTPAVEMENTAREA ENTRANCE RAMPREHAB888 I 35 7480-120 MN/DOT RECONSTRUCTION OF MEDF0RD ROUND-A-BOUTS0.4 SC GRADE AND SF 250,000 0 00 250,000 0SURFACE889 TH 42 7901-43 MN/DOT REPLACE BRIDGE 5968 ON T.H. 42 (NEAR ELGIN)0.0 BR BRIDGEBR 1,500,000 1,200,000 00 300,000 0REPLACEMENT890 TH 43 2306-22 MN/DOT REPLACE BRIDGE 23004 NEAR CHOICE0.0 BR BRIDGEBR 1,740,000 1,392,000 00 348,000 0REPLACEMENT891 TH 52 2310-34 MN/DOT PRESTON HISTORIC OVERLOOK RESTORATION - SCENIC 0.0 RB REST AREA SB 987,516 787,516 00 200,000 0BYWAY FUNDS892 TH 52 2505-48CE1 MN/DOT DESIGN BUILD - ELK RUN INTERCHANGE - <strong>2012</strong> COSTS 1.5 MC GRADE AND SF 1,890,000 0 00 1,890,000 0FOR CONSTRUCTION ENGINEERINGBRIDGE893 TH 52 2505-48RW1 MN/DOT **BP08**DESIGN BUILD - ELK RUN INTERCHANGE - <strong>2012</strong> 1.5 MC GRADE AND SF 3,565,000 0 00 3,565,000 0COSTS FOR RIGHT OF WAYBRIDGE894 TH 52 2505-48UT1 MN/DOT DESIGN BUILD - ELK RUN INTERCHANGE - <strong>2012</strong> COSTS 1.5 MC GRADE AND SF 1,000,000 0 00 1,000,000 0FOR UTILITIESBRIDGE895 TH 52 2505-49 MN/DOT CONCRETE PAVEMENT REHABILITATION NB AND SB 12.5 RS CONCRETE NHS 5,230,000 4,184,000 00 1,046,000 0FROM 85TH STREET (ROCHESTER) TO 1.3 MI N OFPAVEMENTGOODHUE CSAH 7 (NEAR ZUMBROTA)REHAB896 TH 52 2506-69 MN/DOT **TED** COOPERATIVE AGREEMENT - GRADING ANDBITUMINOUS SURFACING AT INTERSECTION OF TH 52AND CSAH 68 NORTH OF ZUMBROTA IN GOODHUECOUNTY0.2 AM GRADE ANDSURFACESF BF LF 1,548,225 0 00 400,000 1,148,225September 2011Project Listing Page III - 70 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!