12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: MFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1694 US 169 2776-03RW11 MNDOT I-494, BLOOMINGTON-RW FOR RECONSTRUCTION OF 0.2 RW RIGHT OF WAY NHS 3,500,000 2,800,000 00 700,000 0INTERCHANGE1695 US 169 7009-67 MN/DOT NEAR OLD SCOTT CO RD 63 (LYNVILLE DR), SAND CREEK 1.1 RD EROSION REPAIR SF 85,000 0 00 85,000 0TWP-RECONSTRUCT DRAINAGE DITCH1696 US 212 1013-79A MNDOT **MN163**NORWOOD YOUNG AMERICA TO CARVER CORD 147, CARVER-PRELIMINARY ENGINEERING, RWACQUISITION, ACCESS MGMT, & CONSTRUCTION OFEXPANDED RDWY (SAFETEA-LU)14.0 PL PLANNINGHPP 899,901 719,921 00 89,990 89,9901697 US 212 1013-79B MNDOT NORWOOD YOUNG AMERICA TO CHASKA-US HIGHWAY 14.0 PL PLANNINGHPP 755,911 604,729 00 75,591 75,591212 EXPANSION(2008 APPROP ACT-TCSP)1698 US 212 1017-100 MNDOT AT CARVER CSAH 11 INTERCHANGE IN CHASKA-0.3 RB LANDSCAPING SF 50,000 0 00 50,000 0LANDSCAPING1699 MN 280 6241-60 MNDOT ENERGY PARK DR, ST PAUL TO BROADWAY,3.4 RC LANDSCAPING SF 50,000 0 00 50,000 0LAUDERDALE - LANDSCAPING1700 I 494 8285-84 MNDOT FROM MAXWELL (WASHINGTON CSAH 38) IN NEWPORT 0.8 RB LANDSCAPING SF 100,000 0 00 100,000 0TO HARDMAN AVE IN S ST PAUL-LANDSCAPING1701 MN 610 0217-23 MN/DOT FROM US169 IN BROOKLYN PARK TO US10 IN COON6.6 TM TRAFFIC MGMT. SF 500,000 0 00 500,000 0RAPIDS-INSTALL TRAFFIC MANAGEMENT SYSTEMSYSTEM1702 MN 610 2771-38F MN/DOT **MN082** TH 169 IN BROOKLYN PARK TO I94 IN MAPLE 5.0 MC GRADE,SURFACE HPP 373,018 373,018 00 0 0GROVE-GRADING, BRS(2004 APPROPRIATIONS ACT)& BRIDGE1703 I 694 6285-135AC MN/DOT AT INTERCHANGE OF I694/TH51/TH10 & ON I694 AT ISLANDLAKE CHANNEL-RECONSTRUCT INTERCHANGEINCLUDING GRADING, SURFACING & REPLACING 7BRIDGES (BR # 9301, 9302, 9310, 9311, 9312, 9447, 9448)WITH 6 NEW BRIDGES (BR # 62716, 62717, 62719, 62720,62051, 62052)2.2 RC BITUMINOUSOVERLAYIM 27,436,423 27,436,423 00 0 01704 I 694 6285-145 MN/DOT FROM HAMLINE AVE IN ARDEN HILLS TO VICTORIA1.0 SC FENCINGSTP 20,000 18,000 00 2,000 0STREET (RAMSEY CSAH 52) IN SHOREVIEW - FENCING(DE-BUNDLED FROM 6285-135)1705 I 694 6285-<strong>15</strong>0 MN/DOT AT LEXINGTON AVE IN ARDEN HILLS-WIDEN TRAIL & BR62824, ADA IMPROVEMENTS, SIGNAL & RAMPMODIFICATIONS, MILL & OVERLAY, ANDCHANNELIZATION(CHANGED FROM SP 6285-62824 INDRAFT ATIP)0.1 BI SPOTIMPROVEMENTSF 750,000 0 00 750,000 0September 2011Project Listing Page III - 128 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!