12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: ST CLOUD AREA PLANNING ORGANIZATIONFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other394 CSAH 999 005-030-001 BENTON COUNTY SAFETY & GEOMETRIC IMPROVEMENTS AT 5INTERSECTIONS: BENTON CSAH 1 & CSAH 29, CSAH 1 &CSAH 4, CSAH 5 & CSAH 6, CSAH 6 & TH 23, & CSAH 4 &CSAH 60.0 SC TURN LANES STP 202,000 161,600 00 0 40,400395 CSAH 3 005-603-027 BENTON COUNTY BENTON COUNTY CSAH 3: BENTON DRIVE TO TH 10, 0.0 PL PLANNING STP 69,863 0 130,1370 0 69,863CONDUCT EVIRONMENTAL STUDY, (AC PROJECT,PAYBACK IN 2014)420 CR 134 073-596-006AC1 STEARNS COUNTY GRADING, AGG BASE, BITUMINOUS SURFACING, CURB &GUTTER, DRAINAGE, SIGNING & STRIPING, BR #73571 &APPURTENANT WORK ON STEARNS CR 134 FROMSTEARNS CSAH 4 TO 350 FT. S OF WEST OAKS DR & ONSTEARNS CR 134 FROM DRIFTWOOD RD TO RILLA RD (ACPAYBACK, 1 OF 2)0.5 MC GRADE,SURFACE &STP 2,485,104 2,485,104 00 0 0421 CSAH 120 073-720-002 STEARNS COUNTY SAFETY IMPROVEMENTS FROM 500 FEET WEST OF 50TH 0.5 SC MEDIAN BARRIER STP 500,000 0 1,000,0000 0 500,000AVENUE TO CONNECTICUT AVENUE IN SARTELL (ACPROJECT, PAYBACK IN 20<strong>15</strong>)433 PED/BIKE 162-090-005 ST CLOUD EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST CLOUD CIVIC 0.2 EN PEDESTRIAN TEA 3,050,000 493,465 00 0 2,556,535CENTER NORTH TO 5TH AVENUE ALONG MISSISSIPPIBIKE TRAILRIVER IN ST CLOUD434 MSAS 101 162-101-012AC ST CLOUD **MN122** 10TH ST BRIDGE APPROACH WORK, 5TH AVE TO 0.6 RC GRADE AND STP 601,439 601,439 00 0 01ST AVE (AC PAYBACK 1 OF 1)SURFACE441 MN <strong>15</strong> 7321-47 MNDOT **BP09** CONSTRUCT NEW INTERCHANGE AT JCTSTEARNS CO. CSAH 120 IN ST. CLOUD & SARTELL, INCL.NEW BR #73017 (CHAPTER 36 BOND-GM INTERCHANGEPROGRAM)0.3 MC GRADE,SURFACE& BRIDGESB BF 17,500,000 0 00 4,500,000 13,000,000444 MN 23 0503-75AC1 MNDOT JCT TH 95 E OF ST CLOUD TO JCT TH 25 IN FOLEY,CONSTRUCT 4-LANE EXPRESSWAY; AND CONSTRUCTBRIDGE #05017; AND FROM JCT TH 25 IN FOLEY TO 1.7 MIE, MILL AND OVERLAY, UPGRADE PED RAMPS (ACPAYBACK 1 OF 2)8.3 MC GRADE,SURFACE& BRIDGENHS <strong>15</strong>,834,444 <strong>15</strong>,834,444 00 0 0445 MN 23 0503-84 MNDOT AESTHETICS FOR NEW BRIDGE # 73014 (GRANITE CITY 0.2 RB LANDSCAPING SF 100,000 0 00 100,000 0BRIDGE) OVER MISSISSIPPI RIVER IN ST. CLOUD446 MN 23 7305-118 MNDOT **BR4M** FROM 0.5 MI. W. OF I-94 TO 1.5 MI. E. OF I-94 IN 2.0 RS MILL & OVERLAY STP 553,411 442,729 00 110,682 0WAITE PARK, MILL & OVERLAY447 MN 23 7306-95 MNDOT N JCT TH <strong>15</strong> TO 19 1/2 ST IN ST CLOUD (EB & WB), MILL & 1.1 RS MILL AND NHS 1,689,000 1,351,200 00 337,800 0OVERLAYOVERLAY451 I 94 7380-221 MNDOT REPLACE TYPE A & OVERHEAD SIGNS, DOUGLAS/TODDCO LINE TO WRIGHT/HENNEPIN CO LINE; AND TYPE ASIGNS ON TH 10 FROM ST. CLOUD TO LITTLE FALLS ANDON TH <strong>15</strong> IN BENTON CO90.7 SC SIGNINGSF 500,000 0 00 500,000 0September 2011MPO Project Listing A-1 Page 12 of 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!