Illustrative ProjectsFiscal Years <strong>2012</strong>-20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>ATP: 1Fiscal Year: 2014RouteSeq # ProposedSystem Year Project Number Agency Description Miles Program Type of Work Total FHWA AC FTA TH OtherFundsMSAS 2014 118-080-036 DULUTH **ILLUSTRATIVE** DULUTH HEIGHTS CONNECTOR(JOSHUA AVE) FROM MAPLE GROVE TO ARROWHEADROAD, NEW ROADWAY0.5 MC GRADE AND STP 7,200,000 0 00 0 7,200,000SURFACE$7,200,000 $0 $0 $0 $0 $7,200,000September 2011Project Listing Page III - 172 of 172