12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project selection includes two iterative processes. The firstiterative process is “determining the program” from the list ofprojects within the draft ATIPs. This includes the analysis ofthe preferred sources of funding for the projects and thedirections included in the Minnesota Statewide TransportationPlan. It also is the step where the fiscal constraint ismaintained. The second iterative process is the review of the<strong>STIP</strong>. The draft <strong>STIP</strong> is circulated back to the District/ATP forreview and comment. Changes are made in the draft <strong>STIP</strong> as aresult of the review and comment period. The <strong>STIP</strong> isforwarded to the Commissioner’s staff for review and approvalbefore being sent to the U.S. DOT.II-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!