12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 7Fiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1178 RR 40-00105 MNDOT DIVISION ST, MUN 3 IN LE SUEUR, INSTALL GATES0.0 SR RR X-INGRRS 356,000 320,400 00 0 35,600IMPROVEMENTS1179 CSAH 4 022-604-013 FARIBAULT 0.6 MI E OF JCT TH 169, REPLACE BRIDGE 922910.0 BR BRIDGEBROS 535,500 428,400 00 0 107,100COUNTYREPLACEMENT1180 PED/BIKE 032-090-007 JACKSON COUNTY LOON LAKE TRAIL IN JACKSON CO, PHASE 31.2 EN PEDESTRIAN TEA 203,344 162,675 00 0 40,669BIKE TRAIL1181 TWN 183 032-599-089AC JACKSON COUNTY 0.3 MI NORTH OF CSAH 18 (JACKSON CO), REPLACE BR 0.0 BR BRIDGEBROS 198,000 198,000 00 0 02628 (AC PAYBACK 1 OF 1)REPLACEMENT1182 PED/BIKE 040-090-001 LE SUEUR COUNTY TRAIL IN THE CITY OF LE SUEUR, ALONG KINGSWAY1.7 EN PEDESTRIAN TEA 275,162 220,129 00 0 55,033DRIVE & BORIGHT STREET CONNECTING WITH A DIRTBIKE TRAILTRAIL & EXISTING SIDEWALK1183 CSAH 29 & 2 040-629-006 LE SUEUR COUNTY FROM CSAH 28 TO TH 13/21, WIDEN PAVEMENT &5.5 RD MILL ANDSTP 2,750,000 1,326,000 00 0 1,424,000OVERLY, CIR & TILEOVERLAY1184 CSAH 5 052-605-061 NICOLLET COUNTY FROM CSAH 40 TO 357TH AVE, RECONSTRUCT ROADWAY 1.2 MC GRADE AND STP 1,680,000 1,326,000 00 0 354,000SURFACE1185 PED/BIKE 053-610-008 NOBLES COUNTY ALONG CSAH 10 FROM INT. OF CSAH 10 & CSAH 35 TO 1.5 EN PEDESTRIAN TEA 729,997 400,000 00 0 329,9971.47 MI SOUTH (OLSON PARK), CONSTRUCT WESTBIKE TRAILWORTHINGTON TRAIL FOR PEDS & BIKES (FED $ CAPPED)1186 PED/BIKE 072-090-002 SIBLEY BRIDGES FOR PRAIRIE LINE TRAIL, ALONG CO RD 166 0.0 EN PEDESTRIAN TEA 616,000 400,000 00 0 216,000(PHASE 2A)BIKE BRIDGE1187 PED/BIKE 072-591-001 SIBLEY **SRTS IN** PE FOR SIDEWALKS AND INFRASTRUCTUREIMPROVEMENTS FOR WALKING AND BIKING TO SIBLEYEAST AND ST PAUL'S SCHOOLS IN ARLINGTON (SEE 072-591-002 FOR CONST PROJ)0.0 BT PED./BIKEIMPROVEMENTSRTS 23,480 <strong>15</strong>,750 00 0 7,7301188 PED/BIKE 072-591-002 SIBLEY **SRTS IN** SIDEWALKS AND INFRASTRUCTURE0.0 BT PED./BIKESRTS 331,741 184,230 00 0 147,511IMPROVEMENTS FOR WALKING AND BIKING TO SIBLEYIMPROVEMENTEAST AND ST PAUL'S SCHOOLS IN ARLINGTON1189 MSAS 126 165-126-005 ST PETER DAVIS ST TO TH 22 REALIGNMENT OF N WASHINGTON 0.0 MC GRADE AND STP 3,324,000 460,000 576,0000 0 2,864,000AVE IN ST PETER (NICOLLET CO) (FED $ CAPPED) (ACSURFACEPROJECT, PAYBACK IN 20<strong>15</strong>)1190 PED/BIKE 177-090-005 WORTHINGTON FROM CENTENNIAL PARK AT THE INT OF CSAH 25 & CSAH35 TO WORTHINGTON MIDDLE SCHOOL AT THE INT OFCSAH 10 & CSAH 35, CONSTRUCT WORTHINGTON TRAILFOR PEDS & BIKES0.8 EN PEDESTRIANBIKE TRAILTEA 491,290 342,200 00 0 149,0901191 PED/BIKE 237-090-001 New Prague FROM TH 21 TO 11TH AVE NW, CONSTRUCT PED/BIKE 0.0 EN PEDESTRIAN TEA 305,907 244,726 00 0 61,181TRAILBIKE TRAILSeptember 2011Project Listing Page III - 91 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!