12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 1Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other34 PED/BIKE 129-090-006 GRAND RAPIDS TIOGA TO TH 169 MULTI-USE PED/BIKE TRAIL1.0 EN PED./BIKETEA <strong>15</strong>6,250 125,000 00 0 31,250IMPROVEMENT35 MN 1 3801-18 MNDOT **TRLF** US FOREST ROUTE 553 TO US FOREST ROUTE 5.2 RC GRADE AND FH 7,800,000 6,240,000 00 1,560,000 0424, RECONSTRUCTION (SF PAYBACK IN 2016)SURFACE36 MN 11 3606-54 MNDOT 4.0 AND 5.5 MI EAST OF RANIER, REPLACE BR #'S 6726 & 0.0 BR BRIDGESTP 1,300,000 1,040,000 00 260,000 06727 OVER JACKFISH BAY & TILSON CREEKREPLACEMENT37 MN 23 6910-90 MNDOT **FMB** AT THE MN/WI STATE LINE OVER ST. LOUIS0.0 BI RIP RAPBF 340,000 0 00 0 340,000RIVER, PLACE RIP RAP AROUND PIER(S), BR # 631338 I 35 0980-139 MNDOT **BR4M** I-35 - SCANLON TO APPROXIMATELY JCT OFBOUNDARY AVE, UNBONDED CONCRETE OVERLAY,DRAINAGE REPAIRS, REPAIR BR #'S 09826, 09827, 09828,09829, 09822, 69889, 69890, 69814, TH 2 - PROCTOR TO I-35,MILL & OVERLAY (ASSOC. 6982-287, 6939-19)10.6 RC UNBONDEDCONCRETEOVERLAYBF 31,131,129 0 00 0 31,131,12939 I 35 5880-173 MNDOT 0.5 MI S OF SANDSTONE TO 0.9 MI N PINE CSAH 3311.7 RC BITUMINOUS IM BF 22,700,000 4,537,108 00 1,160,000 17,002,892(NB+SB), UNBONDED CONCRETE OVERLAY, REPAIR BR #OVERLAY9109940 I 35 5880-187 MNDOT **ELLA** BETWEEN SANDSTONE AND THE KETTLE RIVER 8.0 RS BITUMINOUS SF 1,057,427 0 00 1,057,427 0BRIDGE #55808, BITUMINOUS OVERLAYOVERLAY41 I 35 6982-290AC2 MNDOT BOUNDARY AVE TO 26TH AVE E, PAVEMENT REPL &REPAIRS, BR REPL BR #S 69831, 69832, 69880 & REPAIRSBR #S 69851, 69852, 69879 + SPOT REPAIRS AT 21ST AVEW INTERCHANGE, REMOVE BR #S 69835 & 69828 NEAR27TH AVE W, SAFETY IMPROVEMENTS (AC PAYBACK 2OF3)10.0 BR BRIDGEREPLACEMENTIM 4,888,000 4,888,000 00 0 042 US 53 6916-103 MNDOT JCT OF TH 53 & TH 33, REPLACE BR # 69029, REPAIR BR # 0.0 BR BRIDGENHS 2,000,000 1,600,000 00 400,000 069030REPLACEMENT43 US 53 6920-48 MNDOT **MN239** 4.5 MI S JCT TH1 TO S LIMITS OF COOK, 4-LANE 9.3 MC GRADE,SURFACE NCIP 42,924,177 34,339,342 00 8,584,835 0EXPANSION, NEW BR # 69044, 69045 (ALTERNATE BID)& BRIDGE44 MN 61 3805-101 MNDOT 0.3 MI SOUTH OF SILVER CREEK TUNNEL TO 0.1 MI5.5 RX CONCRETE SF 675,000 0 00 675,000 0NORTH OF GOOSEBERRY RIVERPAVEMENTREHAB45 MN 61 3807-52 MNDOT CONSTRUCTION OF TETTEGOUCHE STATE PARK VISITOR 0.0 RB REST AREA CBI 6,829,000 2,972,000 00 0 3,857,000CENTER (BAPTISM RIVER REST AREA) UPGRADE46 US 71 3612-21 MNDOT **ELLA**BR4M** 0.4 MI NORTH OF JCT TH 6 TO JCT TH 71, 27.4 RS MILL ANDSTP 7,297,725 5,838,180 00 1,459,545 0MILL & OVERLAY (ASSOC SP 3613-71)OVERLAYSeptember 2011Project Listing Page III - 6 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!