12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Enhancement ProjectsFiscal Year: 2013Seq #RouteSystem Project Number Agency Description Miles Program ProposedATPType of WorkFundsTotal<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>FHWA AC FTA State Other1796 M PED/BIKE 091-090-073 THREE RIVERS OVER HENNEPIN CSAH 61 IN PLYMOUTH-0.0 EN PEDESTRIAN TEA 1,760,000 1,020,000 00 0 740,000PARK DISTRICT CONSTRUCTION & RW ACQ FOR A LUCE LINEBIKE BRIDGEREGIONAL TR PED/BIKE BRIDGE1797 M PED/BIKE 092-090-049 DNR CONNECT LAKE BYLLESBY REG PARK TO STATE TR- 0.1 EN PEDESTRIAN TEA 678,300 542,640 00 0 135,660CONSTRUCT MILL TOWNS TRAIL PED/BIKE BR OVERBIKE BRIDGECANNON RIVER1800 M PED/BIKE 140-010-007 MENDOTA HTS AT DODD RD(TH 149) & TH 110 IN MENDOTA HTS- 0.0 EN PED./BIKETEA 628,320 502,656 00 0 125,664PEDESTRIAN ACCESS IMPROVEMENTS, SAFETYIMPROVEMENTIMPROVEMENTS1801 M PED/BIKE 141-090-037 MINNEAPOLIS FROM E 28TH ST TO 11TH AVE S ALONG HIAWATHA 0.0 EN LIGHTINGTEA 1,275,000 1,020,000 00 0 255,000LRT TRAIL IN MPLS-LIGHTING1808 M PED/BIKE 194-010-010AC CHANHASSEN AT MINNEWASHTA PKWY & TH 5 IN CHANHASSEN- 0.0 EN PEDESTRIAN TEA 979,200 979,200 00 0 0CONSTRUCT PED/BIKE UNDERPASS (AC PAYBACK 1BIKE BRIDGEOF 1)1812 M PED/BIKE 199-108-003 RAMSEY ALONG MISSISSIPPI RIVER FROM TUNGSTEN ST TO 1.9 EN ENHANCEMENT TEA 509,487 387,808 00 0 121,679RAMSEY BLVD IN RAMSEY-CONSTRUCTMISSISSIPPI RIVER TRAIL$18,198,760 $13,603,604 $0 $0 $52,500 $4,542,656September 2011Enhancement Project Listing A-2 Page 8 of 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!