12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 7Fiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1277 CSAH 5 017-605-022 COTTONWOOD FROM TH 62 TO TH 30, MILL AND OVERLAY12.0 RS MILL ANDSTP 2,163,575 1,326,000 00 0 837,575COUNTYOVERLAY1278 PED/BIKE 032-090-005 JACKSON COUNTY FORT BELMONT - BIKE TRAIL IN THE CITY OF JACKSON 1.5 EN PEDESTRIAN TEA 180,132 141,280 00 0 38,852(FED$CAPPED)BIKE TRAIL1279 CSAH 41 046-641-007 MARTIN COUNTY FROM TH <strong>15</strong> TO CSAH 20, OVERLAY AND AGGREGATE 7.0 RS BITUMINOUS STP 2,046,625 1,326,000 00 0 720,625SHOULDERINGOVERLAY1280 CSAH 13 072-613-014 SIBLEY COUNTY ON CSAH 13 OVER NORTH BRANCH OF RUSH RIVER, 1.3 0.0 BR BRIDGEBROS 465,731 306,334 00 0 <strong>15</strong>9,397MI NORTH OF CO RD 62, REPLACE BR#L2645REPLACEMENT1281 PED/BIKE 083-090-004 WATONWAN WATLINE TRAIL IN WILDLIFE MANAGEMENT AREA ALONG 4.0 EN PEDESTRIAN TEA 414,588 331,670 00 0 82,918COUNTY TH 4BIKE TRAIL1282 PED/BIKE <strong>15</strong>0-090-002 NORTH MANKATO US 14 TRAIL FROM LORAY DRIVE TO WEST LIND STREET 1.4 EN PEDESTRIAN TEA 584,310 400,000 00 0 184,310BIKE TRAIL1283 MSAS 126 165-126-005AC ST PETER DAVIS ST TO TH 22 REALIGNMENT OF N WASHINGTON 0.0 MC GRADE AND STP 576,000 576,000 00 0 0AVE IN ST PETER (NICOLLET CO) (FED $ CAPPED) (ACSURFACEPAYBACK 1 OF 1)1284 MN 4 4601-30 MNDOT 6 MI NORTH OF IOWA STATE LINE, OVER STREAM AND 0.0 BR BRIDGESTP 1,245,000 996,000 00 249,000 0EAST FORK DES MOINES RIVER, REPLACE BR 887 ANDREPLACEMENT66491285 US 14 0702-116AC3 MNDOT **LGA** CSAH 12 & TH 14 BRIDGE #07587 & RAMPS (LGA 0.0 BR NEW BRIDGE NHS 1,000,000 1,000,000 00 0 0PAYBACK TO COUNTY 3 OF 5) TIED 007-612-0111286 MN 22 4012-36 MNDOT **FMP** NEAR ST PETER AT BR#40002, RAISE ROAD0.4 RD GRADE AND BF 3,960,000 0 00 0 3,960,000ELEVATION AND EXTEND BRIDGEBRIDGE1287 MN 60 1703-70 MNDOT MOUNTAIN LAKE TO BUTTERFIELD, EXPANSION (AC4.6 MC GRADE AND NHS 2,760,000 0 11,040,0000 2,760,000 0PAYBACK STARTING IN 2016)SURFACE1288 MN 60 8308-44AC2 MNDOT FROM 3.554 MI E OF THE WATONWAN COUNTY LINE TO 5.2 MC GRADE AND NHS 5,040,000 5,040,000 00 0 0WEST OF ST JAMES (AC PAYBACK 2 of 2)SURFACE1289 MN 62 1704-27 MNDOT **ELLA** FROM TH 59 IN FULDA TO WEST LIMITS OF23.2 RD SURFACING STP 3,059,000 0 12,234,0000 3,059,000 0WINDOM, RECLAIM (AC PROJECT, AC PAYBACKSTARTING IN 2016)1290 US 71 3205-29 MNDOT 0.4 MI NORTH OF JACKSON, OVER DES MOINES RIVER, 0.0 BR BRIDGENHS 4,969,000 3,975,200 00 993,800 0REPLACE BR 6741REPLACEMENT1291 US 169 5209-66 MNDOT **ELLA** ST PETER TO SOUTH OF MN RIVER BRIDGE, MILL 10.5 RS MILL ANDNHS 4,600,000 3,680,000 00 920,000 0AND OVERLAY SB LANES ONLYOVERLAYSeptember 2011Project Listing Page III - 98 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!