12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 6Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other897 TH 56 2006-27 MN/DOT ALTERNATE DESIGN - BIT RECLAMATION/WHITETOPPINGFROM CONCORD ST CSAH 24 (WEST CONCORD) TOHOME ST (KENYON) PLUS REPL BR 5713 & APPRS (N OFWEST CONCORD)8.8 RS BITUMINOUSRECLAMATIONSTP 5,024,400 4,019,520 00 1,004,880 0898 TH 56 2312-14 MN/DOT **BR4M** MEDIUM BITUMINOUS MILL AND OVERLAY FROM 6.4 RS MILL ANDSF 1,600,000 0 00 1,600,000 0JCT US 63 TO E CITY LIMITS OF LEROYOVERLAY899 TH 56 2507-23 MN/DOT RECONSTRUCT FROM HOME ST TO JCT TH 60 (KENYON) 0.6 RS BITUMINOUS STP 1,333,000 603,200 00 <strong>15</strong>0,800 579,000RECLAMATION900 TH 57 2509-22 MN/DOT **BR4M** HEAVY BITUMINOUS MILL AND OVERLAY FROM 4.0 RS MILL ANDSF 1,104,000 0 00 1,104,000 00.35 MI. N. C.R. 30 TO JCT. T.H. 52OVERLAY901 MN 60 7903-49 MN/DOT **FMP** CONTRACT WORK FOR REPAIR OF THE0.1 RS EROSION REPAIR BF 20,000 0 00 0 20,000BUCHMAN COULEE NEAR BRIDGE NO. 5827902 TH 61 2513-88 MN/DOT RED WING - TRAFFIC FLOW IMPROVEMENT PROJECT - 0.3 SC TURN LANES SF 116,000 0 00 116,000 0T.H. 58, 61 AND 63903 TH 61 7904-40 MN/DOT REPLACE BRIDGE 6461 OVER EAST INDIAN CREEK -0.0 BR BRIDGENHS 378,000 0 1,000,0000 378,000 0LOCATED 1.3 MI. NW OF JCT. T.H. 74 (AC PROJECT,REPLACEMENTPAYBACK IN 2013)904 TH 63 5510-77 MN/DOT INTERSECTION IMPROVEMENTS AT 75TH ST. (CSAH 14) 0.0 SH GRADE AND HSIP 1,500,000 675,000 00 75,000 750,000AND T.H. 63 INTERSECTION - ROCHESTERSURFACE905 TH 63 7907-13 MN/DOT REPLACE BRIDGE 4342 OVER STREAM (ZUMBRO FALLS) 0.0 BR BRIDGESTP 450,000 360,000 00 90,000 0REPLACEMENT906 TH 63 7908-29 MN/DOT **ELLA** MEDIUM BITUMINOUS MILL AND OVERLAY FROM 6.2 RS MILL ANDSTP 1,820,384 1,456,307 00 364,077 0CR 78 TO TH 61OVERLAY907 MN 74 8507-26 MN/DOT **TED** - ST. CHARLES INTERSTATE 90 BUSINESS PARK. 0.2 AM GRADE AND BF 70,000 0 00 0 70,000TURN LANES WILL BE CONSTRUCTED ON TH 74 TOSURFACEPROVIDE SAFER ACCESS TO THE NEW BUSINESS PARK908 I 90 5580-86AC MN/DOT BITUMINOUS MILL & OVERLAY FROM 0.3 MI. E. T.H. 63 TO 12.7 RS MILL ANDIM 2,738,098 2,738,098 00 0 01.7 MI. E. OLMSTED CSAH 19 - WB LANES (AC PAYBACK 1OVERLAYOF 1)909 I 90 8580-149 MN/DOT **BP08** DRESBACH BRIDGE 9320 OVER MISSISSIPPIRIVER - BRIDGE REHABILITATION - INCLUDES $21.45MSBPF (30%) AND $71.5M TH BONDS - AC PROJECT,PAYBACK IN 2013 AND 20140.3 BR BRIDGEREPLACEMENTIM BF 140,430,000 21,450,000 50,050,0000 0 118,980,000910 TH 246 6614-26 MN/DOT **ELLA** FROM TH 3 TO CSAH 26 - THIN MILL AND12.2 RS MILL ANDSTP 3,092,249 2,473,799 00 618,450 0OVERLAY, MEDIUM MILL AND OVERLAYOVERLAYSeptember 2011Project Listing Page III - 71 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!