12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: GRAND FORKS-EAST GRAND FORKS METROPOLITAN PLANNING ORGANIZATIONFiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other287 BB TRF-0018-14A EAST GRAND FORKS SECT 5307: EAST GRAND FORKS DAR TRANSIT0.0 B9 OPERATE BUS LF 74,000 0 00 0 74,000OPERATING ASSISTANCE288 BB TRF-0018-14B EAST GRAND FORKS SECT 5307: EAST GRAND FORKS FIXED ROUTE TRANSIT 0.0 B9 OPERATE BUS FTA 265,000 0 0 99,000 0 166,000OPERATING ASSISTANCE304 CITY 119-103-004 EAST GRAND FORKS EAST GRAND FORKS - TH 2 & 5TH AVE NW INTERSECTION 0.0 RC GRADE AND STP 1,880,020 737,880 00 0 1,142,140UPGRADESURFACE319 MN 999 8822-125 MNDOT AT VARIOUS LOCATIONS ON US2 EB & WB, MN200, & 0.0 RS CONCRETE SF 2,<strong>15</strong>0,000 0 00 2,<strong>15</strong>0,000 0MN220, CONCRETE PAVEMENT REHABPAVEMENTREHAB$4,369,020 $737,880 $0 $99,000 $2,<strong>15</strong>0,000 $1,382,140September 2011MPO Project Listing A-1 Page 9 of 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!