12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: DULUTH-SUPERIOR METROPOLITAN INTERSTATE COMMITTEEFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other4 BB TRF-0016-12A DULUTH TRANSIT SECT 5307: DULUTH DIAL-A-RIDE TRANSIT OPERATING 0.0 B9 OPERATE BUS LF 575,960 0 00 0 575,960AUTHORITY ASSISTANCE5 BB TRF-0016-12B DULUTH TRANSIT SECT 5307: DULUTH TRANSIT OPERATING ASSISTANCE 0.0 B9 OPERATE BUS FTA 10,213,005 0 0 1,300,000 0 8,913,005AUTHORITY REGULAR ROUTE & PREVENTATIVE MAINTENANCE6 BB TRF-0016-12C DULUTH TRANSIT SECT 5307: DULUTH TRANSIT CAPITAL0.0 B9 BUS GRANT FTA 699,856 0 0 559,885 0 139,971AUTHORITYCAPITALIMPROVEMENT7 BB TRF-0016-12-JA DULUTH TRANSIT SECT 5316: JARC URBAN OPERATING FUNDS FOR DULUTH 0.0 JA OPERATE BUS FTA 383,000 0 0 191,500 0 191,500AUTHORITY TRANSIT AUTHORITY10 BB TRS-0016-12 DULUTH TRANSIT DTA-PURCHASE 10 BUSES TOTAL, 5 WILL BE HYBRID 0.0 TR PURCHASE BUS STP 4,618,180 3,694,544 00 0 923,636AUTHORITY (CLASS 700)24 CSAH 91 069-691-020 ST LOUIS COUNTY **MN<strong>15</strong>6** ST LOUIS CSAH 91, DM&IR RR CROSSING AT 8TH 2.3 RC GRADE AND HPP 10,000,000 3,599,601 00 0 6,400,399ST, DULUTH, TO CSAH 56, RECONSTRUCTSURFACE29 LOCAL 999 091-070-020 DULUTH AIR GUARD **MN134** CONSTRUCTION OF PRIMARY & SECONDARY 0.0 MC GRADE AND HPP 2,595,969 2,076,775 00 0 519,194ACCESS ROADWAYS TO DULUTH AIR NATIONAL GUARDSURFACEBASE31 PED/BIKE 118-090-016 DULUTH LAKEWALK EXTENSION PHASE IV, 60TH AVE E TO TH 61, 1.0 EN PEDESTRIAN TEA 657,928 526,342 00 0 131,586PED/BIKE FACILITYBIKE BRIDGE32 PED/BIKE 118-090-017 DULUTH LAKEWALK EXTENSION PHASE V, TH 61 TO BRIGHTON 0.5 EN PEDESTRIAN TEA 812,500 650,000 00 0 162,500BEACH, PED/BIKEBIKE BRIDGE33 PED/BIKE 118-090-018 DULUTH **MN146** CROSS CITY TRAIL, DULUTH, PULASKI TO 2.6 BT PED./BIKE HPP 2,312,189 1,849,751 00 0 462,438WASECA INDUSTRIAL BLVD., PED/BIKE FACILITYIMPROVEMENT37 MN 23 6910-90 MNDOT **FMB** AT THE MN/WI STATE LINE OVER ST. LOUIS RIVER, 0.0 BI RIP RAPBF 340,000 0 00 0 340,000PLACE RIP RAP AROUND PIER(S), BR # 631338 I 35 0980-139 MNDOT **BR4M** I-35 - SCANLON TO APPROXIMATELY JCT OFBOUNDARY AVE, UNBONDED CONCRETE OVERLAY,DRAINAGE REPAIRS, REPAIR BR #'S 09826, 09827, 09828,09829, 09822, 69889, 69890, 69814, TH 2 - PROCTOR TO I-35,MILL & OVERLAY (ASSOC. 6982-287, 6939-19)10.6 RC UNBONDEDCONCRETEOVERLAYBF 31,131,129 0 00 0 31,131,12941 I 35 6982-290AC2 MNDOT BOUNDARY AVE TO 26TH AVE E, PAVEMENT REPL &REPAIRS, BR REPL BR #S 69831, 69832, 69880 & REPAIRSBR #S 69851, 69852, 69879 + SPOT REPAIRS AT 21ST AVE WINTERCHANGE, REMOVE BR #S 69835 & 69828 NEAR 27THAVE W, SAFETY IMPROVEMENTS (AC PAYBACK 2 OF3)10.0 BR BRIDGEREPLACEMENTIM 4,888,000 4,888,000 00 0 051 I 535 6981-9030E MNDOT BLATNIK BR #9030 BETWEEN DULUTH & SUPERIOR, 0.0 BI BRIDGE REPAIR IM 9,000,000 4,050,000 00 450,000 4,500,000PARTIAL PAINTING & DECK SEAL (MINNESOTA &WISCONSIN SHARES)$78,227,716 $21,335,013 $0 $2,051,385 $450,000 $54,391,318September 2011MPO Project Listing A-1 Page 3 of 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!