12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 6Fiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1071 TH 26 2802-65 MN/DOT **ELLA** REPLACE BRIDGE 5720 NEAR BROWNSVILLE 0.0 BR BRIDGESTP 1,250,000 1,000,000 00 250,000 0REPLACEMENT1072 I 35 7480-113AC1 MN/DOT RECONST PVMT NB AND SB FROM 40.787 TO 42.608, BITMILL AND OVLY NB AND SB FROM 35.906 TO 39.399 ANDFROM 42.608 TO 55.268, CONST AUXILIARY LANE ON NBAND SB I-35 FROM T.H. 14 W TO BRIDGE STREET ANDREPL BRS 748<strong>15</strong>, 74816, 74817 AND 74818 - OWATONNA(AC P19.4 RS MILL ANDOVERLAYIM 10,000,000 10,000,000 00 0 01073 TH 42 7901-47 MN/DOT REPLACE BRIDGE 5969 ON T.H. 42 (NEAR ELGIN)0.0 BR BRIDGESTP 1,217,000 973,600 00 243,400 0REPLACEMENT1074 TH 43 8502-33 MN/DOT MED. BIT. MILL & OVERLAY FROM E. JCT. I-90 TO TH 61 10.6 RS MILL ANDSTP 2,893,000 2,314,400 00 578,600 0OVERLAY1075 TH 43 8503-46 MN/DOT **ELLA** - REPLACE BRIDGE 5900 IN WINONA - INCLUDES 1.1 BR BRIDGEBR BF 39,420,000 19,710,000 91,980,0000 0 19,710,000$19.71M SBPF (30%) AND $19.71M TH BONDS (30%) (ACREPLACEMENTPAYBACK IN 2016 & 2017)1076 TH 44 2804-35 MN/DOT RECONSTRUCT RETAINING WALL IN HOKAH0.1 RC MISCELLANEOUS SF 500,000 0 00 500,000 01077 TH 56 5005-58 MN/DOT REPLACE BRIDGE 5905 - FARM ENTRANCE OVER NORTH 0.0 BR BRIDGESTP 490,500 392,400 00 98,100 0BRANCH UPPER IOWA RIVER - NEAR TAOPIREPLACEMENT1078 TH 60 7902-23 MN/DOT REPLACE BRIDGE 6832 NEAR MAZEPPA0.2 BR BRIDGESTP 1,309,000 1,047,200 00 261,800 0REPLACEMENT1079 TH 63 7908-30 MN/DOT REPLACE BRIDGES 9166 AND 9167 OVER MILLER CREEK 0.0 BR BRIDGESTP 2,446,000 1,956,800 00 489,200 0REPLACEMENT1080 TH 65 2404-41 MN/DOT **ELLA** HEAVY/MED. BIT. OVERLAY & MILL & FILL - NB & 7.1 RS MILL ANDSTP 3,002,000 2,401,600 00 412,900 187,500SB FROM 0.5 MI. S. I-35 (4-LANE) TO JCT. T.H. 13OVERLAY1081 I 90 8580-163 MN/DOT MED MILL AND OVERLAY EB AND WB FROM 0.8 MI W TH 76 8.4 RS MILL ANDIM 5,349,000 4,814,100 00 534,900 0TO O.69 W OF CSAH 12 OVERPASSOVERLAY1082 TH 109 2407-09 MN/DOT DM&E - UPGRADE TO GATES - BROADWAY, ALDEN,0.0 SR RR X-INGRRS 275,000 247,500 00 27,500 0FREEBORN COUNTYIMPROVEMENTS1083 TH 999 8826-110 MN/DOT **ADA** FUNDS - PEDESTRIAN RAMPS - VARIOUS0.0 SC PED./BIKESTP 287,500 230,000 00 57,500 0LOCATIONS DISTRICTWIDE - 20<strong>15</strong>IMPROVEMENT1084 MN 999 8806-LT-<strong>15</strong>S MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 20<strong>15</strong>0.0 SH LIGHTINGHSIP 50,000 45,000 00 5,000 01085 MN 999 8806-RW-<strong>15</strong> MN/DOT DISTRICTWIDE SETASIDES - R/W - 20<strong>15</strong>0.0 RW RIGHT OF WAY SF 7,000,000 0 00 7,000,000 01086 MN 999 8806-SAS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - 20<strong>15</strong>0.0 NA MISCELLANEOUS STP 20,827,578 2,560,000 00 18,267,578 0September 2011Project Listing Page III - 83 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!